Steel Plant in Türkiye. Approximate location 41.56564, 32.42929.
Steel PlantTürkiyeCO₂ reported
Mescier Iron and Steel Bartin plant is a steel plant in Türkiye with a reported capacity of 1,000,000 t of steel. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace). It is operated by Mescier Demir Celik AŞ. By capacity it ranks #22 of 26 steel plants tracked in Türkiye. It emits about 51,759 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 12,065 cars. Its CO₂ per unit of capacity is about 90% below the median steel plant.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1567077.
Bei 1,000,000 t of steel ist Mescier Iron and Steel Bartin plant unter dem Medianwert von steel plant in Türkiye (1,400,000 t of steel). Sein CO₂ pro Kapazitätseinheit liegt ungefähr 45% unter dem Medianwert von steel plant. Untersektor: iron-and-steel. Als steel plant benötigt es intensive Prozesswärme (typischerweise 800–1500°C) für seinen Kernbetrieb — Wärme, die durch Dampfkessel, Öfen oder direkte Verbrennung geliefert werden muss, und Verluste durch ungedämmte Behälter und Rohrleitungen stellen verschwendeten Brennstoff dar. Modulare abnehmbare Dämmung kann diese Verluste um 80–96% senken, Oberflächen auf ≤45°C kühlen, mit Amortisationszeiten oft unter 2 Jahren. Stahlwerke verbrennen Kohle in Hochöfen oder nutzen Lichtbogenöfen zum Schmelzen von Schrott; in beiden Fällen muss das geschmolzene Metall über 1.500°C gehalten und durch umfangreiche heiße Rohrleitungen und Behälter geleitet werden.
Vergleich von Kapazität und CO₂-Intensität berechnet aus Climate TRACE Industrieanlagendaten; Sektorrolle basierend auf Ingenieurreferenz.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of steel), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by Mescier Demir Celik AŞ. All facilities by this operator →
Mescier Iron and Steel Bartin plant sits in a humid subtropical climate zone (Köppen Cfa), at 41.6°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #22 largest of 26 steel plants in Türkiye by reported capacity.
Coordinates 41.56564, 32.42929. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Mescier Iron and Steel Bartin plant is a steel plant in Türkiye. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace).
Mescier Iron and Steel Bartin plant has a reported capacity of 1,000,000 t of steel.
Mescier Iron and Steel Bartin plant emits about 51,759 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 12,065 cars. That ranks #92 among tracked facilities in Türkiye.
Mescier Iron and Steel Bartin plant is in Türkiye, near coordinates 41.56564, 32.42929.
Mescier Iron and Steel Bartin plant is operated by Mescier Demir Celik AŞ.