Home / South America / Brazil / Cement plants / Lagoa Santa Cement Plant

Lagoa Santa Cement Plant

Cement Plant in Brazil. Approximate location -19.68297, -43.92583.

Cement PlantBrazilCO₂ reported

Lagoa Santa Cement Plant is a cement plant in Brazil with a reported capacity of 4,900,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Empresa de Cimentos Liz SA. By capacity it ranks #2 of 57 cement plants tracked in Brazil. It emits about 1,679,156 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 391,412 cars. Its CO₂ per unit of capacity is about 5% below the median cement plant.

4,900,000t of cement
1,679,156t CO₂e / yr (Climate TRACE)
#22CO₂ rank in Brazil
0.34t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-32437291.

Im Kontext: wie sich diese Anlage vergleicht

Bei 4,900,000 t of cement ist Lagoa Santa Cement Plant deutlich über dem Medianwert von cement plant in Brazil (1,461,000 t of cement). Sein CO₂ pro Kapazitätseinheit liegt ungefähr 5% über dem Medianwert von cement plant. Untersektor: cement. Als cement plant benötigt es intensive Prozesswärme (typischerweise 800–1400°C) für seinen Kernbetrieb — Wärme, die durch Dampfkessel, Öfen oder direkte Verbrennung geliefert werden muss, und Verluste durch ungedämmte Behälter und Rohrleitungen stellen verschwendeten Brennstoff dar. Modulare abnehmbare Dämmung kann diese Verluste um 80–96% senken, Oberflächen auf ≤45°C kühlen, mit Amortisationszeiten oft unter 2 Jahren. Zementanlagen erhitzen Kalkstein auf 1.400°C in Drehrohröfen — einer der heißesten Industrieprozesse — und müssen die Temperatur über die gesamte Ofenlänge präzise kontrollieren.

Vergleich von Kapazität und CO₂-Intensität berechnet aus Climate TRACE Industrieanlagendaten; Sektorrolle basierend auf Ingenieurreferenz.

What 1,679,156 t CO₂e a year looks like

This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

391,412cars driven for a year
218,982homes' annual energy use
27,985,933tree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Capacity vs largest cement plants in Brazil

Rio Branco do Sul Cement Plant: 7,000,000 t of cement7.0MRio Branco…Lagoa Santa Cement Plant: 4,900,000 t of cement4.9MLagoa Sant…Salto de Pirapora Cement Plant: 4,800,000 t of cement4.8MSalto de P…Ciplam Sobradinho Cement Plant: 3,800,000 t of cement3.8MCiplam Sob…Carandaí Cement Plant: 3,400,000 t of cement3.4MCarandaí C…Barroso Cement Plant: 3,200,000 t of cement3.2MBarroso Ce…Apiai Cement Plant: 3,200,000 t of cement3.2MApiai Ceme…Balsa nova Cement Plant: 2,800,000 t of cement2.8MBalsa nova…

Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Operator

Operated by Empresa de Cimentos Liz SA. All facilities by this operator →

Local climate

Lagoa Santa Cement Plant sits in a humid subtropical (dry winter) climate zone (Köppen Cwa), at 19.7°S in the southern hemisphere.

~19°Ctypical annual mean
~27°Ctypical warm-season
Humid subtropical (dry winter): warm all year, with distinct wet and dry seasons

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

How it compares & nearby sites

The #2 largest of 57 cement plants in Brazil by reported capacity.

Nearby industrial sites

Location

Coordinates -19.68297, -43.92583. View on OpenStreetMap.

Hot industrial equipment? Cut the heat loss.

Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

  • Up to 96% less heat loss from insulated surfaces
  • Surface temperature down to ≤45°C for worker safety
  • 6× faster maintenance access — removable and refittable
  • Typical payback up to 2 years

See Inzonex process-equipment insulation →

Inzonex modular insulation on industrial equipment

Frequently asked questions

What type of facility is Lagoa Santa Cement Plant?

Lagoa Santa Cement Plant is a cement plant in Brazil. It burns limestone in high-temperature rotary kilns to make clinker and cement.

What is the capacity of Lagoa Santa Cement Plant?

Lagoa Santa Cement Plant has a reported capacity of 4,900,000 t of cement.

How much CO₂ does Lagoa Santa Cement Plant emit?

Lagoa Santa Cement Plant emits about 1,679,156 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 391,412 cars. That ranks #22 among tracked facilities in Brazil.

Where is Lagoa Santa Cement Plant located?

Lagoa Santa Cement Plant is in Brazil, near coordinates -19.68297, -43.92583.

Who operates Lagoa Santa Cement Plant?

Lagoa Santa Cement Plant is operated by Empresa de Cimentos Liz SA.

Built from open public data; no personal information. Operate this site? Request a correction or removal.