Home / Africa / Morocco / Cement plants / Lafarge Settat Cement Plant 2

Lafarge Settat Cement Plant 2

Cement Plant in Morocco. Approximate location 33.36726, -7.74863.

Cement PlantMoroccoCO₂ reported

Lafarge Settat Cement Plant 2 is a cement plant in Morocco with a reported capacity of 3,000,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by LafargeHolcim Maroc SA. By capacity it ranks #1 of 14 cement plants tracked in Morocco. It emits about 1,508,077 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 351,533 cars. Its CO₂ per unit of capacity is about 40% above the median cement plant.

3,000,000t of cement
1,508,077t CO₂e / yr (Climate TRACE)
#1CO₂ rank in Morocco
0.50t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1897464.

Im Kontext: wie sich diese Anlage vergleicht

Bei 3,000,000 t of cement ist Lafarge Settat Cement Plant 2 deutlich über dem Medianwert von cement plant in Morocco (1,600,000 t of cement). Sein CO₂ pro Kapazitätseinheit liegt ungefähr 59% über dem Medianwert von cement plant. Untersektor: cement. Als cement plant benötigt es intensive Prozesswärme (typischerweise 800–1400°C) für seinen Kernbetrieb — Wärme, die durch Dampfkessel, Öfen oder direkte Verbrennung geliefert werden muss, und Verluste durch ungedämmte Behälter und Rohrleitungen stellen verschwendeten Brennstoff dar. Modulare abnehmbare Dämmung kann diese Verluste um 80–96% senken, Oberflächen auf ≤45°C kühlen, mit Amortisationszeiten oft unter 2 Jahren. Zementanlagen erhitzen Kalkstein auf 1.400°C in Drehrohröfen — einer der heißesten Industrieprozesse — und müssen die Temperatur über die gesamte Ofenlänge präzise kontrollieren.

Vergleich von Kapazität und CO₂-Intensität berechnet aus Climate TRACE Industrieanlagendaten; Sektorrolle basierend auf Ingenieurreferenz.

What 1,508,077 t CO₂e a year looks like

This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

351,533cars driven for a year
196,671homes' annual energy use
25,134,617tree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Capacity vs largest cement plants in Morocco

Lafarge Settat Cement Plant 2: 3,000,000 t of cement3.0MLafarge Se…Tetouan Cement Plant: 2,500,000 t of cement2.5MTetouan Ce…Imi Mqourn Cement Plant: 2,200,000 t of cement2.2MImi Mqourn…Meknes Cement Plant: 1,750,000 t of cement1.8MMeknes Cem…Lafarge Settat Cement Plant 1: 1,700,000 t of cement1.7MLafarge Se…Ouled Ghanem Cement Plant: 1,600,000 t of cement1.6MOuled Ghan…Lafarge Taroudant Cement Plant: 1,600,000 t of cement1.6MLafarge Ta…Dir El Ksiba Cement Plant: 1,600,000 t of cement1.6MDir El Ksi…

Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Operator

Operated by LafargeHolcim Maroc SA. All facilities by this operator →

Local climate

Lafarge Settat Cement Plant 2 sits in a hot-summer Mediterranean climate zone (Köppen Csa), at 33.4°N in the northern hemisphere.

~17°Ctypical annual mean
~27°Ctypical warm-season
Hot-summer mediterranean: hot summers and mild winters

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

How it compares & nearby sites

The #1 largest of 14 cement plants in Morocco by reported capacity.

Nearby industrial sites

Location

Coordinates 33.36726, -7.74863. View on OpenStreetMap.

Hot industrial equipment? Cut the heat loss.

Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

  • Up to 96% less heat loss from insulated surfaces
  • Surface temperature down to ≤45°C for worker safety
  • 6× faster maintenance access — removable and refittable
  • Typical payback up to 2 years

See Inzonex process-equipment insulation →

Inzonex modular insulation on industrial equipment

Frequently asked questions

What type of facility is Lafarge Settat Cement Plant 2?

Lafarge Settat Cement Plant 2 is a cement plant in Morocco. It burns limestone in high-temperature rotary kilns to make clinker and cement.

What is the capacity of Lafarge Settat Cement Plant 2?

Lafarge Settat Cement Plant 2 has a reported capacity of 3,000,000 t of cement.

How much CO₂ does Lafarge Settat Cement Plant 2 emit?

Lafarge Settat Cement Plant 2 emits about 1,508,077 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 351,533 cars. That ranks #1 among tracked facilities in Morocco.

Where is Lafarge Settat Cement Plant 2 located?

Lafarge Settat Cement Plant 2 is in Morocco, near coordinates 33.36726, -7.74863.

Who operates Lafarge Settat Cement Plant 2?

Lafarge Settat Cement Plant 2 is operated by LafargeHolcim Maroc SA.

Built from open public data; no personal information. Operate this site? Request a correction or removal.