Cement Plant in Turkmenistan. Approximate location 39.68401, 54.30231.
Cement PlantTurkmenistanCO₂ reported
Jebel Cement Plant is a cement plant in Turkmenistan with a reported capacity of 1,000,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Ministry of Industry and Construction Production (Turkmenistan). By capacity it ranks #3 of 4 cement plants tracked in Turkmenistan. It emits about 530,823 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 123,735 cars. Its CO₂ per unit of capacity is about 47% above the median cement plant.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1897836.
Bei 1,000,000 t of cement ist Jebel Cement Plant unter dem Medianwert von cement plant in Turkmenistan (2,000,000 t of cement). Sein CO₂ pro Kapazitätseinheit liegt ungefähr 12% unter dem Medianwert von cement plant. Untersektor: cement. Als cement plant benötigt es intensive Prozesswärme (typischerweise 800–1400°C) für seinen Kernbetrieb — Wärme, die durch Dampfkessel, Öfen oder direkte Verbrennung geliefert werden muss, und Verluste durch ungedämmte Behälter und Rohrleitungen stellen verschwendeten Brennstoff dar. Modulare abnehmbare Dämmung kann diese Verluste um 80–96% senken, Oberflächen auf ≤45°C kühlen, mit Amortisationszeiten oft unter 2 Jahren. Zementanlagen erhitzen Kalkstein auf 1.400°C in Drehrohröfen — einer der heißesten Industrieprozesse — und müssen die Temperatur über die gesamte Ofenlänge präzise kontrollieren.
Vergleich von Kapazität und CO₂-Intensität berechnet aus Climate TRACE Industrieanlagendaten; Sektorrolle basierend auf Ingenieurreferenz.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by Ministry of Industry and Construction Production (Turkmenistan). All facilities by this operator →
Jebel Cement Plant sits in a cold desert climate zone (Köppen BWk), at 39.7°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #3 largest of 4 cement plants in Turkmenistan by reported capacity.
Coordinates 39.68401, 54.30231. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Jebel Cement Plant is a cement plant in Turkmenistan. It burns limestone in high-temperature rotary kilns to make clinker and cement.
Jebel Cement Plant has a reported capacity of 1,000,000 t of cement.
Jebel Cement Plant emits about 530,823 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 123,735 cars. That ranks #5 among tracked facilities in Turkmenistan.
Jebel Cement Plant is in Turkmenistan, near coordinates 39.68401, 54.30231.
Jebel Cement Plant is operated by Ministry of Industry and Construction Production (Turkmenistan).