Home / Russian Federation / Cement plants / HeidelbergCement novogurovsky Tulacement Cement Plant

HeidelbergCement novogurovsky Tulacement Cement Plant

Cement Plant in Russian Federation. Approximate location 54.48252, 37.33954.

Cement PlantRussian FederationCO₂ reported

HeidelbergCement novogurovsky Tulacement Cement Plant is a cement plant in Russian Federation with a reported capacity of 2,000,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by HeidelbergCement Rus LLC. By capacity it ranks #18 of 53 cement plants tracked in Russian Federation. It emits about 783,398 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 182,610 cars. Its CO₂ per unit of capacity is about 9% above the median cement plant.

2,000,000t of cement
783,398t CO₂e / yr (Climate TRACE)
#74CO₂ rank in Russian Federation
0.39t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-32439072.

Im Kontext: wie sich diese Anlage vergleicht

Bei 2,000,000 t of cement ist HeidelbergCement novogurovsky Tulacement Cement Plant etwa um dem Medianwert von cement plant in Russian Federation (1,700,000 t of cement). Sein CO₂ pro Kapazitätseinheit liegt ungefähr 6% unter dem Medianwert von cement plant. Untersektor: cement. Als cement plant benötigt es intensive Prozesswärme (typischerweise 800–1400°C) für seinen Kernbetrieb — Wärme, die durch Dampfkessel, Öfen oder direkte Verbrennung geliefert werden muss, und Verluste durch ungedämmte Behälter und Rohrleitungen stellen verschwendeten Brennstoff dar. Modulare abnehmbare Dämmung kann diese Verluste um 80–96% senken, Oberflächen auf ≤45°C kühlen, mit Amortisationszeiten oft unter 2 Jahren. Zementanlagen erhitzen Kalkstein auf 1.400°C in Drehrohröfen — einer der heißesten Industrieprozesse — und müssen die Temperatur über die gesamte Ofenlänge präzise kontrollieren.

Vergleich von Kapazität und CO₂-Intensität berechnet aus Climate TRACE Industrieanlagendaten; Sektorrolle basierend auf Ingenieurreferenz.

What 783,398 t CO₂e a year looks like

This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

182,610cars driven for a year
102,165homes' annual energy use
13,056,633tree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Capacity vs largest cement plants in Russian Federation

Mordovtsement Cement Plant: 5,000,000 t of cement5.0MMordovtsem…Sebryakovsky Cement Plant: 4,060,000 t of cement4.1MSebryakovs…Oskolcement Cement Plant: 3,700,000 t of cement3.7MOskolcemen…Topkinsky Cement Plant: 3,700,000 t of cement3.7MTopkinsky …SLK Sukholozhskcement Cement Plant: 3,500,000 t of cement3.5MSLK Sukhol…novoroscement Proletary Cement Plant: 2,600,000 t of cement2.6Mnovoroscem…Ferzikovo Cement Plant: 2,420,000 t of cement2.4MFerzikovo …Maltsovsky Portlandcement Cement Plant: 2,348,000 t of cement2.3MMaltsovsky…

Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Operator

Operated by HeidelbergCement Rus LLC. All facilities by this operator →

Local climate

HeidelbergCement novogurovsky Tulacement Cement Plant sits in a warm-summer humid continental climate zone (Köppen Dfb), at 54.5°N in the northern hemisphere.

~6°Ctypical annual mean
~19°Ctypical warm-season
Warm-summer humid continental: four distinct seasons — cold winters and warm summers

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

How it compares & nearby sites

The #18 largest of 53 cement plants in Russian Federation by reported capacity.

Nearby industrial sites

Location

Coordinates 54.48252, 37.33954. View on OpenStreetMap.

Hot industrial equipment? Cut the heat loss.

Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

  • Up to 96% less heat loss from insulated surfaces
  • Surface temperature down to ≤45°C for worker safety
  • 6× faster maintenance access — removable and refittable
  • Typical payback up to 2 years

See Inzonex process-equipment insulation →

Inzonex modular insulation on industrial equipment

Frequently asked questions

What type of facility is HeidelbergCement novogurovsky Tulacement Cement Plant?

HeidelbergCement novogurovsky Tulacement Cement Plant is a cement plant in Russian Federation. It burns limestone in high-temperature rotary kilns to make clinker and cement.

What is the capacity of HeidelbergCement novogurovsky Tulacement Cement Plant?

HeidelbergCement novogurovsky Tulacement Cement Plant has a reported capacity of 2,000,000 t of cement.

How much CO₂ does HeidelbergCement novogurovsky Tulacement Cement Plant emit?

HeidelbergCement novogurovsky Tulacement Cement Plant emits about 783,398 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 182,610 cars. That ranks #74 among tracked facilities in Russian Federation.

Where is HeidelbergCement novogurovsky Tulacement Cement Plant located?

HeidelbergCement novogurovsky Tulacement Cement Plant is in Russian Federation, near coordinates 54.48252, 37.33954.

Who operates HeidelbergCement novogurovsky Tulacement Cement Plant?

HeidelbergCement novogurovsky Tulacement Cement Plant is operated by HeidelbergCement Rus LLC.

Built from open public data; no personal information. Operate this site? Request a correction or removal.