Steel Plant in Indonesia. Approximate location -6.27974, 107.11496.
Steel PlantIndonesiaCO₂ reported
Gunung Raja Paksi West Java steel plant is a steel plant in Indonesia with a reported capacity of 2,800,000 t of steel. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace). It is operated by PT Gunung Raja Paksi Tbk. By capacity it ranks #4 of 8 steel plants tracked in Indonesia. It emits about 1,748,129 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 407,489 cars. Its CO₂ per unit of capacity is about 16% above the median steel plant.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-32441187.
Bei 2,800,000 t of steel ist Gunung Raja Paksi West Java steel plant etwa um dem Medianwert von steel plant in Indonesia (2,800,000 t of steel). Untersektor: iron-and-steel. Als steel plant benötigt es intensive Prozesswärme (typischerweise 800–1500°C) für seinen Kernbetrieb — Wärme, die durch Dampfkessel, Öfen oder direkte Verbrennung geliefert werden muss, und Verluste durch ungedämmte Behälter und Rohrleitungen stellen verschwendeten Brennstoff dar. Modulare abnehmbare Dämmung kann diese Verluste um 80–96% senken, Oberflächen auf ≤45°C kühlen, mit Amortisationszeiten oft unter 2 Jahren. Stahlwerke verbrennen Kohle in Hochöfen oder nutzen Lichtbogenöfen zum Schmelzen von Schrott; in beiden Fällen muss das geschmolzene Metall über 1.500°C gehalten und durch umfangreiche heiße Rohrleitungen und Behälter geleitet werden.
Vergleich von Kapazität und CO₂-Intensität berechnet aus Climate TRACE Industrieanlagendaten; Sektorrolle basierend auf Ingenieurreferenz.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of steel), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by PT Gunung Raja Paksi Tbk. All facilities by this operator →
Gunung Raja Paksi West Java steel plant sits in a tropical rainforest climate zone (Köppen Af), at 6.3°S in the southern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #4 largest of 8 steel plants in Indonesia by reported capacity.
Coordinates -6.27974, 107.11496. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Gunung Raja Paksi West Java steel plant is a steel plant in Indonesia. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace).
Gunung Raja Paksi West Java steel plant has a reported capacity of 2,800,000 t of steel.
Gunung Raja Paksi West Java steel plant emits about 1,748,129 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 407,489 cars. That ranks #11 among tracked facilities in Indonesia.
Gunung Raja Paksi West Java steel plant is in Indonesia, near coordinates -6.27974, 107.11496.
Gunung Raja Paksi West Java steel plant is operated by PT Gunung Raja Paksi Tbk.