Steel Plant in Poland. Approximate location 50.35432, 18.61081.
Steel PlantPolandCO₂ reported
Ferrostal Labedy Gliwice steel plant is a steel plant in Poland with a reported capacity of 500,000 t of steel. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace). It is operated by Ferrostal Labedy SP zoo. By capacity it ranks #6 of 6 steel plants tracked in Poland. It emits about 26,929 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 6,277 cars. Its CO₂ per unit of capacity is about 90% below the median steel plant.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1567007.
Bei 500,000 t of steel ist Ferrostal Labedy Gliwice steel plant unter dem Medianwert von steel plant in Poland (900,000 t of steel). Sein CO₂ pro Kapazitätseinheit liegt ungefähr 37% unter dem Medianwert von steel plant. Untersektor: iron-and-steel. Als steel plant benötigt es intensive Prozesswärme (typischerweise 800–1500°C) für seinen Kernbetrieb — Wärme, die durch Dampfkessel, Öfen oder direkte Verbrennung geliefert werden muss, und Verluste durch ungedämmte Behälter und Rohrleitungen stellen verschwendeten Brennstoff dar. Modulare abnehmbare Dämmung kann diese Verluste um 80–96% senken, Oberflächen auf ≤45°C kühlen, mit Amortisationszeiten oft unter 2 Jahren. Stahlwerke verbrennen Kohle in Hochöfen oder nutzen Lichtbogenöfen zum Schmelzen von Schrott; in beiden Fällen muss das geschmolzene Metall über 1.500°C gehalten und durch umfangreiche heiße Rohrleitungen und Behälter geleitet werden.
Vergleich von Kapazität und CO₂-Intensität berechnet aus Climate TRACE Industrieanlagendaten; Sektorrolle basierend auf Ingenieurreferenz.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of steel), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by Ferrostal Labedy SP zoo. All facilities by this operator →
Ferrostal Labedy Gliwice steel plant sits in a temperate oceanic climate zone (Köppen Cfb), at 50.4°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #6 largest of 6 steel plants in Poland by reported capacity.
Coordinates 50.35432, 18.61081. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Ferrostal Labedy Gliwice steel plant is a steel plant in Poland. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace).
Ferrostal Labedy Gliwice steel plant has a reported capacity of 500,000 t of steel.
Ferrostal Labedy Gliwice steel plant emits about 26,929 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 6,277 cars. That ranks #149 among tracked facilities in Poland.
Ferrostal Labedy Gliwice steel plant is in Poland, near coordinates 50.35432, 18.61081.
Ferrostal Labedy Gliwice steel plant is operated by Ferrostal Labedy SP zoo.