Cement Plant in Türkiye. Approximate location 38.27915, 39.7426.
Cement PlantTürkiyeCO₂ reported
Ergani Cement Plant is a cement plant in Türkiye with a reported capacity of 1,400,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Limak Cimento Sanayi ve Ticaret AŞ. By capacity it ranks #45 of 57 cement plants tracked in Türkiye. It emits about 558,175 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 130,111 cars. Its CO₂ per unit of capacity is about 11% above the median cement plant.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-32439198.
Bei 1,400,000 t of cement ist Ergani Cement Plant unter dem Medianwert von cement plant in Türkiye (2,000,000 t of cement). Sein CO₂ pro Kapazitätseinheit liegt ungefähr 10% über dem Medianwert von cement plant. Untersektor: cement. Als cement plant benötigt es intensive Prozesswärme (typischerweise 800–1400°C) für seinen Kernbetrieb — Wärme, die durch Dampfkessel, Öfen oder direkte Verbrennung geliefert werden muss, und Verluste durch ungedämmte Behälter und Rohrleitungen stellen verschwendeten Brennstoff dar. Modulare abnehmbare Dämmung kann diese Verluste um 80–96% senken, Oberflächen auf ≤45°C kühlen, mit Amortisationszeiten oft unter 2 Jahren. Zementanlagen erhitzen Kalkstein auf 1.400°C in Drehrohröfen — einer der heißesten Industrieprozesse — und müssen die Temperatur über die gesamte Ofenlänge präzise kontrollieren.
Vergleich von Kapazität und CO₂-Intensität berechnet aus Climate TRACE Industrieanlagendaten; Sektorrolle basierend auf Ingenieurreferenz.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by Limak Cimento Sanayi ve Ticaret AŞ. All facilities by this operator →
Ergani Cement Plant sits in a hot-summer Mediterranean climate zone (Köppen Csa), at 38.3°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #45 largest of 57 cement plants in Türkiye by reported capacity.
Coordinates 38.27915, 39.7426. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Ergani Cement Plant is a cement plant in Türkiye. It burns limestone in high-temperature rotary kilns to make clinker and cement.
Ergani Cement Plant has a reported capacity of 1,400,000 t of cement.
Ergani Cement Plant emits about 558,175 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 130,111 cars. That ranks #46 among tracked facilities in Türkiye.
Ergani Cement Plant is in Türkiye, near coordinates 38.27915, 39.7426.
Ergani Cement Plant is operated by Limak Cimento Sanayi ve Ticaret AŞ.