Cement Plant in Mongolia. Approximate location 49.43661, 105.97879.
Cement PlantMongoliaCO₂ reported
Erel Darkhan Cement Plant is a cement plant in Mongolia with a reported capacity of 185,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by Erel Cement Co. By capacity it ranks #6 of 6 cement plants tracked in Mongolia. It emits about 63,985 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 14,915 cars.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-42546762.
Bei 185,000 t of cement ist Erel Darkhan Cement Plant unter dem Medianwert von cement plant in Mongolia (1,000,000 t of cement). Sein CO₂ pro Kapazitätseinheit liegt ungefähr 14% unter dem Medianwert von cement plant. Untersektor: cement. Als cement plant benötigt es intensive Prozesswärme (typischerweise 800–1400°C) für seinen Kernbetrieb — Wärme, die durch Dampfkessel, Öfen oder direkte Verbrennung geliefert werden muss, und Verluste durch ungedämmte Behälter und Rohrleitungen stellen verschwendeten Brennstoff dar. Modulare abnehmbare Dämmung kann diese Verluste um 80–96% senken, Oberflächen auf ≤45°C kühlen, mit Amortisationszeiten oft unter 2 Jahren. Zementanlagen erhitzen Kalkstein auf 1.400°C in Drehrohröfen — einer der heißesten Industrieprozesse — und müssen die Temperatur über die gesamte Ofenlänge präzise kontrollieren.
Vergleich von Kapazität und CO₂-Intensität berechnet aus Climate TRACE Industrieanlagendaten; Sektorrolle basierend auf Ingenieurreferenz.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by Erel Cement Co. All facilities by this operator →
Erel Darkhan Cement Plant sits in a monsoon warm-summer continental climate zone (Köppen Dwb), at 49.4°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #6 largest of 6 cement plants in Mongolia by reported capacity.
Coordinates 49.43661, 105.97879. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Erel Darkhan Cement Plant is a cement plant in Mongolia. It burns limestone in high-temperature rotary kilns to make clinker and cement.
Erel Darkhan Cement Plant has a reported capacity of 185,000 t of cement.
Erel Darkhan Cement Plant emits about 63,985 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 14,915 cars. That ranks #6 among tracked facilities in Mongolia.
Erel Darkhan Cement Plant is in Mongolia, near coordinates 49.43661, 105.97879.
Erel Darkhan Cement Plant is operated by Erel Cement Co.