Home / Asia / Malaysia / Steel plants / Eden Flame Johor steel plant

Eden Flame Johor steel plant

Steel Plant in Malaysia. Approximate location 1.45112, 103.91742.

Steel PlantMalaysiaCO₂ reported

Eden Flame Johor steel plant is a steel plant in Malaysia with a reported capacity of 1,050,000 t of steel. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace). It is operated by Eden Flame Sdn Bhd. By capacity it ranks #7 of 10 steel plants tracked in Malaysia. It emits about 266,918 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 62,219 cars. Its CO₂ per unit of capacity is about 53% below the median steel plant.

1,050,000t of steel
266,918t CO₂e / yr (Climate TRACE)
#33CO₂ rank in Malaysia
0.25t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1566988.

Im Kontext: wie sich diese Anlage vergleicht

Bei 1,050,000 t of steel ist Eden Flame Johor steel plant unter dem Medianwert von steel plant in Malaysia (1,400,000 t of steel). Sein CO₂ pro Kapazitätseinheit liegt ungefähr 73% unter dem Medianwert von steel plant. Untersektor: iron-and-steel. Als steel plant benötigt es intensive Prozesswärme (typischerweise 800–1500°C) für seinen Kernbetrieb — Wärme, die durch Dampfkessel, Öfen oder direkte Verbrennung geliefert werden muss, und Verluste durch ungedämmte Behälter und Rohrleitungen stellen verschwendeten Brennstoff dar. Modulare abnehmbare Dämmung kann diese Verluste um 80–96% senken, Oberflächen auf ≤45°C kühlen, mit Amortisationszeiten oft unter 2 Jahren. Stahlwerke verbrennen Kohle in Hochöfen oder nutzen Lichtbogenöfen zum Schmelzen von Schrott; in beiden Fällen muss das geschmolzene Metall über 1.500°C gehalten und durch umfangreiche heiße Rohrleitungen und Behälter geleitet werden.

Vergleich von Kapazität und CO₂-Intensität berechnet aus Climate TRACE Industrieanlagendaten; Sektorrolle basierend auf Ingenieurreferenz.

What 266,918 t CO₂e a year looks like

This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

62,219cars driven for a year
34,809homes' annual energy use
4,448,633tree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Capacity vs largest steel plants in Malaysia

Alliance Steel Kuantan plant: 3,500,000 t of steel3.5MAlliance S…Lion Industries Megasteel plant: 3,200,000 t of steel3.2MLion Indus…Eastern Steel Kemaman plant: 2,700,000 t of steel2.7MEastern St…Malaysia Steel Works Klang: 1,600,000 t of steel1.6MMalaysia S…Southern Steel Prai Penang plant: 1,400,000 t of steel1.4MSouthern S…Lion Industries Amsteel Banting steel plant: 1,250,000 t of steel1.2MLion Indus…Eden Flame Johor steel plant: 1,050,000 t of steel1.0MEden Flame…Ann Joo Integrated Steel Penang plant: 900,000 t of steel900kAnn Joo In…

Reported capacity (t of steel), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Operator

Operated by Eden Flame Sdn Bhd. All facilities by this operator →

Local climate

Eden Flame Johor steel plant sits in a tropical rainforest climate zone (Köppen Af), at 1.5°N in the northern hemisphere.

~26°Ctypical annual mean
~27°Ctypical warm-season
Tropical rainforest: hot and humid year-round with little seasonal variation

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

How it compares & nearby sites

The #7 largest of 10 steel plants in Malaysia by reported capacity.

Nearby industrial sites

Location

Coordinates 1.45112, 103.91742. View on OpenStreetMap.

Hot industrial equipment? Cut the heat loss.

Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

  • Up to 96% less heat loss from insulated surfaces
  • Surface temperature down to ≤45°C for worker safety
  • 6× faster maintenance access — removable and refittable
  • Typical payback up to 2 years

See Inzonex process-equipment insulation →

Inzonex modular insulation on industrial equipment

Frequently asked questions

What type of facility is Eden Flame Johor steel plant?

Eden Flame Johor steel plant is a steel plant in Malaysia. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace).

What is the capacity of Eden Flame Johor steel plant?

Eden Flame Johor steel plant has a reported capacity of 1,050,000 t of steel.

How much CO₂ does Eden Flame Johor steel plant emit?

Eden Flame Johor steel plant emits about 266,918 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 62,219 cars. That ranks #33 among tracked facilities in Malaysia.

Where is Eden Flame Johor steel plant located?

Eden Flame Johor steel plant is in Malaysia, near coordinates 1.45112, 103.91742.

Who operates Eden Flame Johor steel plant?

Eden Flame Johor steel plant is operated by Eden Flame Sdn Bhd.

Built from open public data; no personal information. Operate this site? Request a correction or removal.