Cement Plant in Algeria. Approximate location 36.12906, 1.2424.
Cement PlantAlgeriaCO₂ reported
Chelf Cement Plant is a cement plant in Algeria with a reported capacity of 4,200,000 t of cement. It burns limestone in high-temperature rotary kilns to make clinker and cement. It is operated by El Chellif Cement and Derivatives Co. By capacity it ranks #2 of 16 cement plants tracked in Algeria. It emits about 1,375,040 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 320,522 cars. Its CO₂ per unit of capacity is about 9% below the median cement plant.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1896656.
Bei 4,200,000 t of cement ist Chelf Cement Plant deutlich über dem Medianwert von cement plant in Algeria (1,200,000 t of cement). Sein CO₂ pro Kapazitätseinheit liegt ungefähr 10% unter dem Medianwert von cement plant. Untersektor: cement. Als cement plant benötigt es intensive Prozesswärme (typischerweise 800–1400°C) für seinen Kernbetrieb — Wärme, die durch Dampfkessel, Öfen oder direkte Verbrennung geliefert werden muss, und Verluste durch ungedämmte Behälter und Rohrleitungen stellen verschwendeten Brennstoff dar. Modulare abnehmbare Dämmung kann diese Verluste um 80–96% senken, Oberflächen auf ≤45°C kühlen, mit Amortisationszeiten oft unter 2 Jahren. Zementanlagen erhitzen Kalkstein auf 1.400°C in Drehrohröfen — einer der heißesten Industrieprozesse — und müssen die Temperatur über die gesamte Ofenlänge präzise kontrollieren.
Vergleich von Kapazität und CO₂-Intensität berechnet aus Climate TRACE Industrieanlagendaten; Sektorrolle basierend auf Ingenieurreferenz.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of cement), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by El Chellif Cement and Derivatives Co. All facilities by this operator →
Chelf Cement Plant sits in a hot-summer Mediterranean climate zone (Köppen Csa), at 36.1°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #2 largest of 16 cement plants in Algeria by reported capacity.
Coordinates 36.12906, 1.2424. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Chelf Cement Plant is a cement plant in Algeria. It burns limestone in high-temperature rotary kilns to make clinker and cement.
Chelf Cement Plant has a reported capacity of 4,200,000 t of cement.
Chelf Cement Plant emits about 1,375,040 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 320,522 cars. That ranks #4 among tracked facilities in Algeria.
Chelf Cement Plant is in Algeria, near coordinates 36.12906, 1.2424.
Chelf Cement Plant is operated by El Chellif Cement and Derivatives Co.