Home / Asia / Kazakhstan / Oil refineries / CAPSI Aktau Bitum Refinery

CAPSI Aktau Bitum Refinery

Refinery in Kazakhstan. Approximate location 43.66541, 51.2811.

RefineryKazakhstanCO₂ reported

CAPSI Aktau Bitum Refinery is a refinery in Kazakhstan with a reported capacity of 20,000 BBL per day. It processes crude oil into fuels and petrochemical feedstocks through distillation, cracking and reforming. It is operated by National Company KazMunayGas JSC. By capacity it ranks #4 of 4 oil refineries tracked in Kazakhstan. It emits about 85,787 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 19,997 cars. Its CO₂ per unit of capacity is about 49% below the median refinery.

20,000BBL per day
85,787t CO₂e / yr (Climate TRACE)
#20CO₂ rank in Kazakhstan
4.29t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-40040666.

Im Kontext: wie sich diese Anlage vergleicht

Bei 20,000 BBL per day ist CAPSI Aktau Bitum Refinery unter dem Medianwert von refinery in Kazakhstan (120,000 BBL per day). Sein CO₂ pro Kapazitätseinheit liegt ungefähr 69% unter dem Medianwert von refinery. Untersektor: oil-and-gas-refining. Als refinery benötigt es intensive Prozesswärme (typischerweise 200–600°C) für seinen Kernbetrieb — Wärme, die durch Dampfkessel, Öfen oder direkte Verbrennung geliefert werden muss, und Verluste durch ungedämmte Behälter und Rohrleitungen stellen verschwendeten Brennstoff dar. Modulare abnehmbare Dämmung kann diese Verluste um 80–96% senken, Oberflächen auf ≤45°C kühlen, mit Amortisationszeiten oft unter 2 Jahren. Raffinerien wärmen auf, fraktionieren und chemisch transformieren Rohöl durch energieintensive Destillation und Cracken in Brennstoffe und petrochemische Rohstoffe — extrem anspruchsvoll für Dampfzeugung und Wärmenutzung.

Vergleich von Kapazität und CO₂-Intensität berechnet aus Climate TRACE Industrieanlagendaten; Sektorrolle basierend auf Ingenieurreferenz.

What 85,787 t CO₂e a year looks like

This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

19,997cars driven for a year
11,188homes' annual energy use
1,429,783tree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Capacity vs largest oil refineries in Kazakhstan

Shymkent Oil Refinery: 120,000 BBL per day120kShymkent O…KazMunayGas Pavlodar Refinery: 120,000 BBL per day120kKazMunayGa…KazMunayGas Atyrau Refinery: 110,000 BBL per day110kKazMunayGa…CAPSI Aktau Bitum Refinery: 20,000 BBL per day20kCAPSI Akta…

Reported capacity (BBL per day), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Operator

Operated by National Company KazMunayGas JSC. All facilities by this operator →

Local climate

CAPSI Aktau Bitum Refinery sits in a cold semi-arid steppe climate zone (Köppen BSk), at 43.7°N in the northern hemisphere.

~10°Ctypical annual mean
~23°Ctypical warm-season
Cold semi-arid steppe: four distinct seasons — cold winters and warm summers

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

How it compares & nearby sites

The #4 largest of 4 oil refineries in Kazakhstan by reported capacity.

Nearby industrial sites

Location

Coordinates 43.66541, 51.2811. View on OpenStreetMap.

Hot industrial equipment? Cut the heat loss.

Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

  • Up to 96% less heat loss from insulated surfaces
  • Surface temperature down to ≤45°C for worker safety
  • 6× faster maintenance access — removable and refittable
  • Typical payback up to 2 years

See Inzonex process-equipment insulation →

Inzonex modular insulation on industrial equipment

Frequently asked questions

What type of facility is CAPSI Aktau Bitum Refinery?

CAPSI Aktau Bitum Refinery is a refinery in Kazakhstan. It processes crude oil into fuels and petrochemical feedstocks through distillation, cracking and reforming.

What is the capacity of CAPSI Aktau Bitum Refinery?

CAPSI Aktau Bitum Refinery has a reported capacity of 20,000 BBL per day.

How much CO₂ does CAPSI Aktau Bitum Refinery emit?

CAPSI Aktau Bitum Refinery emits about 85,787 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 19,997 cars. That ranks #20 among tracked facilities in Kazakhstan.

Where is CAPSI Aktau Bitum Refinery located?

CAPSI Aktau Bitum Refinery is in Kazakhstan, near coordinates 43.66541, 51.2811.

Who operates CAPSI Aktau Bitum Refinery?

CAPSI Aktau Bitum Refinery is operated by National Company KazMunayGas JSC.

Built from open public data; no personal information. Operate this site? Request a correction or removal.