Steel Plant in South Africa. Approximate location -27.7157, 30.00726.
Steel PlantSouth AfricaCO₂ reported
ArcelorMittal Newcastle Steel Works is a steel plant in South Africa with a reported capacity of 1,899,000 t of steel. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace). It is operated by ArcelorMittal South Africa Ltd. By capacity it ranks #2 of 4 steel plants tracked in South Africa. It emits about 2,351,963 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 548,243 cars. Its CO₂ per unit of capacity is about 129% above the median steel plant.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1567184.
Bei 1,899,000 t of steel ist ArcelorMittal Newcastle Steel Works etwa um dem Medianwert von steel plant in South Africa (1,899,000 t of steel). Untersektor: iron-and-steel. Als steel plant benötigt es intensive Prozesswärme (typischerweise 800–1500°C) für seinen Kernbetrieb — Wärme, die durch Dampfkessel, Öfen oder direkte Verbrennung geliefert werden muss, und Verluste durch ungedämmte Behälter und Rohrleitungen stellen verschwendeten Brennstoff dar. Modulare abnehmbare Dämmung kann diese Verluste um 80–96% senken, Oberflächen auf ≤45°C kühlen, mit Amortisationszeiten oft unter 2 Jahren. Stahlwerke verbrennen Kohle in Hochöfen oder nutzen Lichtbogenöfen zum Schmelzen von Schrott; in beiden Fällen muss das geschmolzene Metall über 1.500°C gehalten und durch umfangreiche heiße Rohrleitungen und Behälter geleitet werden.
Vergleich von Kapazität und CO₂-Intensität berechnet aus Climate TRACE Industrieanlagendaten; Sektorrolle basierend auf Ingenieurreferenz.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of steel), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Operated by ArcelorMittal South Africa Ltd. All facilities by this operator →
ArcelorMittal Newcastle Steel Works sits in a subtropical highland climate zone (Köppen Cwb), at 27.7°S in the southern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #2 largest of 4 steel plants in South Africa by reported capacity.
Coordinates -27.7157, 30.00726. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

ArcelorMittal Newcastle Steel Works is a steel plant in South Africa. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace).
ArcelorMittal Newcastle Steel Works has a reported capacity of 1,899,000 t of steel.
ArcelorMittal Newcastle Steel Works emits about 2,351,963 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 548,243 cars. That ranks #2 among tracked facilities in South Africa.
ArcelorMittal Newcastle Steel Works is in South Africa, near coordinates -27.7157, 30.00726.
ArcelorMittal Newcastle Steel Works is operated by ArcelorMittal South Africa Ltd.