Steel Plant in Saudi Arabia. Approximate location 26.28253, 49.95605.
Steel PlantSaudi ArabiaCO₂ reported
Al Qaryan steel plant is a steel plant in Saudi Arabia with a reported capacity of 700,000 t of steel. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace). By capacity it ranks #6 of 6 steel plants tracked in Saudi Arabia. It emits about 910,474 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 212,232 cars. Its CO₂ per unit of capacity is about 141% above the median steel plant.
Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-42741845.
Bei 700,000 t of steel ist Al Qaryan steel plant unter dem Medianwert von steel plant in Saudi Arabia (1,200,000 t of steel). Sein CO₂ pro Kapazitätseinheit liegt ungefähr 138% über dem Medianwert von steel plant. Untersektor: iron-and-steel. Als steel plant benötigt es intensive Prozesswärme (typischerweise 800–1500°C) für seinen Kernbetrieb — Wärme, die durch Dampfkessel, Öfen oder direkte Verbrennung geliefert werden muss, und Verluste durch ungedämmte Behälter und Rohrleitungen stellen verschwendeten Brennstoff dar. Modulare abnehmbare Dämmung kann diese Verluste um 80–96% senken, Oberflächen auf ≤45°C kühlen, mit Amortisationszeiten oft unter 2 Jahren. Stahlwerke verbrennen Kohle in Hochöfen oder nutzen Lichtbogenöfen zum Schmelzen von Schrott; in beiden Fällen muss das geschmolzene Metall über 1.500°C gehalten und durch umfangreiche heiße Rohrleitungen und Behälter geleitet werden.
Vergleich von Kapazität und CO₂-Intensität berechnet aus Climate TRACE Industrieanlagendaten; Sektorrolle basierend auf Ingenieurreferenz.
This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:
Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.
Reported capacity (t of steel), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).
Al Qaryan steel plant sits in a hot desert climate zone (Köppen BWh), at 26.3°N in the northern hemisphere.
Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).
The #6 largest of 6 steel plants in Saudi Arabia by reported capacity.
Coordinates 26.28253, 49.95605. View on OpenStreetMap.
Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

Al Qaryan steel plant is a steel plant in Saudi Arabia. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace).
Al Qaryan steel plant has a reported capacity of 700,000 t of steel.
Al Qaryan steel plant emits about 910,474 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 212,232 cars. That ranks #38 among tracked facilities in Saudi Arabia.
Al Qaryan steel plant is in Saudi Arabia, near coordinates 26.28253, 49.95605.