Home / Asia / Bangladesh / Steel plants / Abul Khair Steel Sitakunda plant

Abul Khair Steel Sitakunda plant

Steel Plant in Bangladesh. Approximate location 22.47052, 91.73551.

Steel PlantBangladeshCO₂ reported

Abul Khair Steel Sitakunda plant is a steel plant in Bangladesh with a reported capacity of 1,400,000 t of steel. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace). It is operated by Abul Khair Steel Ltd. By capacity it ranks #3 of 5 steel plants tracked in Bangladesh. It emits about 254,428 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 59,307 cars. Its CO₂ per unit of capacity is about 66% below the median steel plant.

1,400,000t of steel
254,428t CO₂e / yr (Climate TRACE)
#8CO₂ rank in Bangladesh
0.18t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1566438.

Im Kontext: wie sich diese Anlage vergleicht

Bei 1,400,000 t of steel ist Abul Khair Steel Sitakunda plant etwa um dem Medianwert von steel plant in Bangladesh (1,400,000 t of steel). Sein CO₂ pro Kapazitätseinheit liegt ungefähr 43% unter dem Medianwert von steel plant. Untersektor: iron-and-steel. Als steel plant benötigt es intensive Prozesswärme (typischerweise 800–1500°C) für seinen Kernbetrieb — Wärme, die durch Dampfkessel, Öfen oder direkte Verbrennung geliefert werden muss, und Verluste durch ungedämmte Behälter und Rohrleitungen stellen verschwendeten Brennstoff dar. Modulare abnehmbare Dämmung kann diese Verluste um 80–96% senken, Oberflächen auf ≤45°C kühlen, mit Amortisationszeiten oft unter 2 Jahren. Stahlwerke verbrennen Kohle in Hochöfen oder nutzen Lichtbogenöfen zum Schmelzen von Schrott; in beiden Fällen muss das geschmolzene Metall über 1.500°C gehalten und durch umfangreiche heiße Rohrleitungen und Behälter geleitet werden.

Vergleich von Kapazität und CO₂-Intensität berechnet aus Climate TRACE Industrieanlagendaten; Sektorrolle basierend auf Ingenieurreferenz.

What 254,428 t CO₂e a year looks like

This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

59,307cars driven for a year
33,180homes' annual energy use
4,240,467tree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Capacity vs largest steel plants in Bangladesh

BSRM Ltd Mirsarai plant: 3,250,000 t of steel3.2MBSRM Ltd M…BSRM Steels Mirsarai plant: 1,600,000 t of steel1.6MBSRM Steel…Abul Khair Steel Sitakunda plant: 1,400,000 t of steel1.4MAbul Khair…GPH Steel Sitakunda plant: 1,051,000 t of steel1.1MGPH Steel …KSRM Sitakunda steel plant: 800,000 t of steel800kKSRM Sitak…

Reported capacity (t of steel), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Operator

Operated by Abul Khair Steel Ltd. All facilities by this operator →

Local climate

Abul Khair Steel Sitakunda plant sits in a tropical monsoon climate zone (Köppen Am), at 22.5°N in the northern hemisphere.

~26°Ctypical annual mean
~28°Ctypical warm-season
Tropical monsoon: warm all year, with distinct wet and dry seasons

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

How it compares & nearby sites

The #3 largest of 5 steel plants in Bangladesh by reported capacity.

Nearby industrial sites

Location

Coordinates 22.47052, 91.73551. View on OpenStreetMap.

Hot industrial equipment? Cut the heat loss.

Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

  • Up to 96% less heat loss from insulated surfaces
  • Surface temperature down to ≤45°C for worker safety
  • 6× faster maintenance access — removable and refittable
  • Typical payback up to 2 years

See Inzonex process-equipment insulation →

Inzonex modular insulation on industrial equipment

Frequently asked questions

What type of facility is Abul Khair Steel Sitakunda plant?

Abul Khair Steel Sitakunda plant is a steel plant in Bangladesh. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace).

What is the capacity of Abul Khair Steel Sitakunda plant?

Abul Khair Steel Sitakunda plant has a reported capacity of 1,400,000 t of steel.

How much CO₂ does Abul Khair Steel Sitakunda plant emit?

Abul Khair Steel Sitakunda plant emits about 254,428 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 59,307 cars. That ranks #8 among tracked facilities in Bangladesh.

Where is Abul Khair Steel Sitakunda plant located?

Abul Khair Steel Sitakunda plant is in Bangladesh, near coordinates 22.47052, 91.73551.

Who operates Abul Khair Steel Sitakunda plant?

Abul Khair Steel Sitakunda plant is operated by Abul Khair Steel Ltd.

Built from open public data; no personal information. Operate this site? Request a correction or removal.