Home / South America / Argentina / Steel plants / ArcelorMittal Acindar Villa Constitución steel plant

ArcelorMittal Acindar Villa Constitución steel plant

Steel Plant in Argentina. Approximate location -33.25241, -60.2925.

Steel PlantArgentinaCO₂ reported

ArcelorMittal Acindar Villa Constitución steel plant is a steel plant in Argentina with a reported capacity of 2,000,000 t of steel. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace). It is operated by Acindar Industria Argentina de Aceros SA. By capacity it ranks #2 of 4 steel plants tracked in Argentina. It emits about 522,018 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 121,683 cars. Its CO₂ per unit of capacity is about 52% below the median steel plant.

2,000,000t of steel
522,018t CO₂e / yr (Climate TRACE)
#13CO₂ rank in Argentina
0.26t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1566425.

在上下文中:该设施如何比较

在2,000,000 t of steel时,ArcelorMittal Acindar Villa Constitución steel plant是Argentina中steel plant的中位数约 2,000,000 t of steel。 子部门:iron-and-steel。 作为steel plant,它需要强烈的工艺热量(通常800–1500°C)来进行其核心工业操作——必须通过锅炉、炉或直接燃烧供应的热量,通过未隔热的容器和管道的损失代表浪费的燃料。可拆卸模块化绝缘可以将这些损失减少80-96%,将表面冷却至≤45°C,投资回收期通常不到2年。 钢铁厂在高炉中燃烧煤炭或使用电弧熔化废料;在两种情况下,熔融金属都必须保持在1,500°C以上并通过广泛的热管和容器转移。

容量和CO₂强度比较从Climate TRACE工业设施数据计算得出;部门角色基于工程参考。

What 522,018 t CO₂e a year looks like

This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

121,683cars driven for a year
68,077homes' annual energy use
8,700,300tree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Capacity vs largest steel plants in Argentina

Ternium Siderar San Nicolás steel plant: 3,501,000 t of steel3.5MTernium Si…ArcelorMittal Acindar Villa Constitución steel plant: 2,000,000 t of steel2.0MArcelorMit…TenarisSiderca Campana steel plant: 1,600,929 t of steel1.6MTenarisSid…Gerdau Sipar Pérez steel plant: 650,000 t of steel650kGerdau Sip…

Reported capacity (t of steel), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Operator

Operated by Acindar Industria Argentina de Aceros SA. All facilities by this operator →

Local climate

ArcelorMittal Acindar Villa Constitución steel plant sits in a humid subtropical climate zone (Köppen Cfa), at 33.3°S in the southern hemisphere.

~18°Ctypical annual mean
~27°Ctypical warm-season
Humid subtropical: hot summers and mild winters

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

How it compares & nearby sites

The #2 largest of 4 steel plants in Argentina by reported capacity.

Nearby industrial sites

Location

Coordinates -33.25241, -60.2925. View on OpenStreetMap.

Hot industrial equipment? Cut the heat loss.

Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

  • Up to 96% less heat loss from insulated surfaces
  • Surface temperature down to ≤45°C for worker safety
  • 6× faster maintenance access — removable and refittable
  • Typical payback up to 2 years

See Inzonex process-equipment insulation →

Inzonex modular insulation on industrial equipment

Frequently asked questions

What type of facility is ArcelorMittal Acindar Villa Constitución steel plant?

ArcelorMittal Acindar Villa Constitución steel plant is a steel plant in Argentina. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace).

What is the capacity of ArcelorMittal Acindar Villa Constitución steel plant?

ArcelorMittal Acindar Villa Constitución steel plant has a reported capacity of 2,000,000 t of steel.

How much CO₂ does ArcelorMittal Acindar Villa Constitución steel plant emit?

ArcelorMittal Acindar Villa Constitución steel plant emits about 522,018 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 121,683 cars. That ranks #13 among tracked facilities in Argentina.

Where is ArcelorMittal Acindar Villa Constitución steel plant located?

ArcelorMittal Acindar Villa Constitución steel plant is in Argentina, near coordinates -33.25241, -60.2925.

Who operates ArcelorMittal Acindar Villa Constitución steel plant?

ArcelorMittal Acindar Villa Constitución steel plant is operated by Acindar Industria Argentina de Aceros SA.

Built from open public data; no personal information. Operate this site? Request a correction or removal.