Home / North America / Mexico / Steel plants / Gerdau Corsa Tultitlán steel plant

Gerdau Corsa Tultitlán steel plant

Steel Plant in Mexico. Approximate location 19.63045, -99.18024.

Steel PlantMexicoCO₂ reported

Gerdau Corsa Tultitlán steel plant is a steel plant in Mexico with a reported capacity of 500,000 t of steel. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace). It is operated by Gerdau Corsa SAPI de CV. By capacity it ranks #14 of 14 steel plants tracked in Mexico. It emits about 24,784 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 5,777 cars. Its CO₂ per unit of capacity is about 91% below the median steel plant.

500,000t of steel
24,784t CO₂e / yr (Climate TRACE)
#62CO₂ rank in Mexico
0.05t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1566983.

У контексті: як порівнюється це підприємство

При потужності 500,000 t of steel Gerdau Corsa Tultitlán steel plant — це нижче медіана steel plant у Mexico (1,330,000 t of steel). Його викидання CO₂ на одиницю потужності приблизно на 20% нижче медіани steel plant. Підсектор: iron-and-steel. Як steel plant, воно вимагає високотемпературного технологічного тепла (зазвичай 800–1500°C) для основних промислових операцій — тепла, яке повинне подаватися котлами, печами або прямим спаленням, і втрати через неізольовані судини та трубопроводи представляють витрачене напразно паливо. Знімна модульна теплоізоляція може зменшити ці втрати на 80–96%, охолодивши поверхню обладнання до ≤45°C, з окупністю часто менше 2 років. Сталеливарні заводи спалюють вугілля у доменних печах або використовують електричні дуги для плавлення брухту; в обох випадках розплавлений метал повинен перебувати вище 1500°C і транспортуватися через розширені гарячі трубопроводи та судини.

Порівняння продуктивності та інтенсивності CO₂ розраховано на основі даних промислових об'єктів Climate TRACE; роль сектору заснована на інженерних довідниках.

What 24,784 t CO₂e a year looks like

This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

5,777cars driven for a year
3,232homes' annual energy use
413,067tree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Capacity vs largest steel plants in Mexico

ArcelorMittal Lázaro Cárdenas steel plant: 6,500,000 t of steel6.5MArcelorMit…Altos Hornos De Mexico SA AHMSA steel plant: 5,500,000 t of steel5.5MAltos Horn…Ternium Guerrero San Nicolás de los Garza steel plant: 2,400,000 t of steel2.4MTernium Gu…DEACERO Celaya steel plant: 2,300,000 t of steel2.3MDEACERO Ce…DEACERO Ramos Arizpe steel plant: 2,200,000 t of steel2.2MDEACERO Ra…TYASA steel plant: 1,650,000 t of steel1.6MTYASA stee…Ternium Puebla steel plant: 1,330,000 t of steel1.3MTernium Pu…Tenaris TAMSA Veracruz steel plant: 1,230,000 t of steel1.2MTenaris TA…

Reported capacity (t of steel), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Operator

Operated by Gerdau Corsa SAPI de CV. All facilities by this operator →

Local climate

Gerdau Corsa Tultitlán steel plant sits in a subtropical highland climate zone (Köppen Cwb), at 19.6°N in the northern hemisphere.

~15°Ctypical annual mean
~20°Ctypical warm-season
Subtropical highland: warm all year, with distinct wet and dry seasons

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

How it compares & nearby sites

The #14 largest of 14 steel plants in Mexico by reported capacity.

Nearby industrial sites

Location

Coordinates 19.63045, -99.18024. View on OpenStreetMap.

Hot industrial equipment? Cut the heat loss.

Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

  • Up to 96% less heat loss from insulated surfaces
  • Surface temperature down to ≤45°C for worker safety
  • 6× faster maintenance access — removable and refittable
  • Typical payback up to 2 years

See Inzonex process-equipment insulation →

Inzonex modular insulation on industrial equipment

Frequently asked questions

What type of facility is Gerdau Corsa Tultitlán steel plant?

Gerdau Corsa Tultitlán steel plant is a steel plant in Mexico. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace).

What is the capacity of Gerdau Corsa Tultitlán steel plant?

Gerdau Corsa Tultitlán steel plant has a reported capacity of 500,000 t of steel.

How much CO₂ does Gerdau Corsa Tultitlán steel plant emit?

Gerdau Corsa Tultitlán steel plant emits about 24,784 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 5,777 cars. That ranks #62 among tracked facilities in Mexico.

Where is Gerdau Corsa Tultitlán steel plant located?

Gerdau Corsa Tultitlán steel plant is in Mexico, near coordinates 19.63045, -99.18024.

Who operates Gerdau Corsa Tultitlán steel plant?

Gerdau Corsa Tultitlán steel plant is operated by Gerdau Corsa SAPI de CV.

Built from open public data; no personal information. Operate this site? Request a correction or removal.