Home / Asia / Indonesia / Textile mills / Pt Taitat Putra Rejeki

Pt Taitat Putra Rejeki

Textiles in Indonesia. Approximate location -6.49331, 106.89119.

TextilesIndonesiaCO₂ reported

Pt Taitat Putra Rejeki is a textile mill in Indonesia with a reported capacity of 95,789,473 USD. It spins, dyes and finishes textiles, leather or apparel using process steam. By capacity it ranks #84 of 166 textile mills tracked in Indonesia. It emits about 2,522 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 588 cars.

2,522t CO₂e / yr (Climate TRACE)
#158CO₂ rank in Indonesia

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-38471975.

En contexte: comment cette installation se compare

À 95,789,473 USD, Pt Taitat Putra Rejeki est autour de la médiane des textile mill en Indonesia (95,789,473 USD). Sous-secteur: textiles-leather-apparel. Comme textile mill, elle nécessite une chaleur de procédé intensive (typiquement 60–150°C) pour ses opérations industrielles essentielles — chaleur qui doit être fournie par des chaudières, fours ou combustion directe, et les pertes par les récipients et tuyauteries non isolés représentent du combustible gaspillé. L'isolation modulaire amovible peut réduire ces pertes de 80–96%, refroidissant les surfaces à ≤45°C, avec des délais d'amortissement souvent inférieurs à 2 ans. Les usines textiles utilisent de la vapeur de procédé pour la teinture, l'apprêtage et le séchage, nécessitant souvent un contrôle strict de la température pendant de longues durées de marche — la perte de chaleur continue érode les profits.

Comparaison de capacité et d'intensité de CO₂ calculée à partir des données des installations industrielles Climate TRACE; rôle du secteur basé sur la référence d'ingénierie.

What 2,522 t CO₂e a year looks like

This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

588cars driven for a year
329homes' annual energy use
42,033tree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Capacity vs largest textile mills in Indonesia

Pt Cap Global Industry International: 95,789,473 USD95.8MPt Cap Glo…Pt. Cch Indonesia: 95,789,473 USD95.8MPt. Cch In…Pt. Lucky Textile Semarang (Plant 3), Lucky Textile Demak: 95,789,473 USD95.8MPt. Lucky …Pt Victory Apparel Semarang: 95,789,473 USD95.8MPt Victory…Pt. Teodore Pan Garmindo Unit 7: 95,789,473 USD95.8MPt. Teodor…Pt. Suryamandiri Tekstil Buana - Pulo Gadung: 95,789,473 USD95.8MPt. Suryam…Pt Selalu Cinta Indonesia: 95,789,473 USD95.8MPt Selalu …Pt. Saimoda Garmindo: 95,789,473 USD95.8MPt. Saimod…

Reported capacity (USD), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Local climate

Pt Taitat Putra Rejeki sits in a tropical rainforest climate zone (Köppen Af), at 6.5°S in the southern hemisphere.

~26°Ctypical annual mean
~27°Ctypical warm-season
Tropical rainforest: hot and humid year-round with little seasonal variation

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

How it compares & nearby sites

The #84 largest of 166 textile mills in Indonesia by reported capacity.

Nearby industrial sites

Location

Coordinates -6.49331, 106.89119. View on OpenStreetMap.

Heat loss & insulation profile

A textile mill like this runs hot equipment that sheds heat continuously: dyeing vessels, stenters/dryers, steam lines, hot-water & boiler house (surface/process temperatures around 80–200 °C). These surfaces lose energy to the air year-round; removable modular insulation cuts that loss, brings outer surfaces to ≤45 °C, and unclips for inspection.

effectively industrial laundries/dyeing - steam & hot water; 500-3000 MWh typical.

Indicative recoverable energy

On an already-insulated site (pipes & valves in cladding / jackets), closing the remaining gaps, flanges and damaged sections and switching to removable covers indicatively recovers about 1,300 MWh/yr (≈ 260 t CO₂/yr) — scaled to this site's reported CO₂ within its sector. Bare or damaged surfaces recover several times more.

See Inzonex insulation → Estimate your site →

Indicative, not a measurement. Conservative floor for an already-insulated plant; a TIPCHECK on-site audit gives a measured figure. Industry context: EiiF TIPCHECK — industrial insulation can save ~14 Mtoe/yr in EU, payback typically <2 years.

Safety & the no-regret first step

Bare hot surfaces here exceed the touch-safe limit (EN ISO 13732-1); insulation to ≤45 °C is a worker-safety and compliance win. And before electrification, fuel-switching or CCS, eliminating surface heat loss is the cheapest, fastest, lowest-risk step — audit the bare spots first, rip-and-replace later.

External climate finance your country can access

Domestic energy-efficiency grants are limited here; industrial decarbonisation is mainly funded externally:

CBAM. Exporters of cement, steel, aluminium, fertiliser, hydrogen and electricity to the EU face the Carbon Border Adjustment Mechanism — cutting embedded emissions (efficiency + insulation) lowers the levy.

Routed via national development banks / accredited entities — not a direct factory grant. Verified 2026.

Frequently asked questions

What type of facility is Pt Taitat Putra Rejeki?

Pt Taitat Putra Rejeki is a textile mill in Indonesia. It spins, dyes and finishes textiles, leather or apparel using process steam.

What is the capacity of Pt Taitat Putra Rejeki?

Pt Taitat Putra Rejeki has a reported capacity of 95,789,473 USD.

How much CO₂ does Pt Taitat Putra Rejeki emit?

Pt Taitat Putra Rejeki emits about 2,522 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 588 cars. That ranks #158 among tracked facilities in Indonesia.

Where is Pt Taitat Putra Rejeki located?

Pt Taitat Putra Rejeki is in Indonesia, near coordinates -6.49331, 106.89119.

Built from open public data; no personal information. Operate this site? Request a correction or removal.