Home / Asia / Indonesia / Textile mills / Pt Ilsung Utama

Pt Ilsung Utama

Textiles in Indonesia. Approximate location -6.92897, 108.87462.

TextilesIndonesiaCO₂ reported

Pt Ilsung Utama is a textile mill in Indonesia with a reported capacity of 95,789,473 USD. It spins, dyes and finishes textiles, leather or apparel using process steam. By capacity it ranks #119 of 166 textile mills tracked in Indonesia. It emits about 2,522 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 588 cars. Its CO₂ per unit of capacity is about 20% above the median textile mill.

95,789,473USD
2,522t CO₂e / yr (Climate TRACE)
#199CO₂ rank in Indonesia
0.00t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-38472221.

En contexto: cómo se compara esta instalación

Con 95,789,473 USD, Pt Ilsung Utama está alrededor de la mediana de textile mill en Indonesia (95,789,473 USD). Subsector: textiles-leather-apparel. Como textile mill, requiere calor de proceso intenso (típicamente 60–150°C) para sus operaciones industriales centrales — calor que debe ser suministrado por calderas, hornos o combustión directa, y las pérdidas a través de recipientes y tuberías sin aislar representan combustible desperdiciado. El aislamiento modular desmontable puede reducir esas pérdidas en un 80–96%, enfriando superficies a ≤45°C, con amortización a menudo inferior a 2 años. Las fábricas textiles utilizan vapor de proceso para teñido, acabado y secado, a menudo requiriendo control de temperatura muy ajustado durante largos tiempos de funcionamiento — la pérdida de calor continua erosiona ganancias.

Comparación de capacidad e intensidad de CO₂ calculada a partir de datos de instalaciones industriales de Climate TRACE; papel del sector basado en referencia de ingeniería.

What 2,522 t CO₂e a year looks like

This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

588cars driven for a year
329homes' annual energy use
42,033tree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Capacity vs largest textile mills in Indonesia

Pt Cap Global Industry International: 95,789,473 USD95.8MPt Cap Glo…Pt. Cch Indonesia: 95,789,473 USD95.8MPt. Cch In…Pt. Lucky Textile Semarang (Plant 3), Lucky Textile Demak: 95,789,473 USD95.8MPt. Lucky …Pt Victory Apparel Semarang: 95,789,473 USD95.8MPt Victory…Pt. Teodore Pan Garmindo Unit 7: 95,789,473 USD95.8MPt. Teodor…Pt. Suryamandiri Tekstil Buana - Pulo Gadung: 95,789,473 USD95.8MPt. Suryam…Pt Selalu Cinta Indonesia: 95,789,473 USD95.8MPt Selalu …Pt. Saimoda Garmindo: 95,789,473 USD95.8MPt. Saimod…

Reported capacity (USD), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Local climate

Pt Ilsung Utama sits in a tropical monsoon climate zone (Köppen Am), at 6.9°S in the southern hemisphere.

~26°Ctypical annual mean
~28°Ctypical warm-season
Tropical monsoon: hot and humid year-round with little seasonal variation

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

How it compares & nearby sites

The #119 largest of 166 textile mills in Indonesia by reported capacity.

Nearby industrial sites

Location

Coordinates -6.92897, 108.87462. View on OpenStreetMap.

Hot industrial equipment? Cut the heat loss.

Kilns, furnaces, boilers, heat exchangers, valves and steam lines on sites like this lose energy continuously. Inzonex makes patented removable modular insulation for hot industrial equipment:

  • Up to 96% less heat loss from insulated surfaces
  • Surface temperature down to ≤45°C for worker safety
  • 6× faster maintenance access — removable and refittable
  • Typical payback up to 2 years

See Inzonex process-equipment insulation →

Inzonex modular insulation on industrial equipment

Frequently asked questions

What type of facility is Pt Ilsung Utama?

Pt Ilsung Utama is a textile mill in Indonesia. It spins, dyes and finishes textiles, leather or apparel using process steam.

What is the capacity of Pt Ilsung Utama?

Pt Ilsung Utama has a reported capacity of 95,789,473 USD.

How much CO₂ does Pt Ilsung Utama emit?

Pt Ilsung Utama emits about 2,522 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 588 cars. That ranks #199 among tracked facilities in Indonesia.

Where is Pt Ilsung Utama located?

Pt Ilsung Utama is in Indonesia, near coordinates -6.92897, 108.87462.

Built from open public data; no personal information. Operate this site? Request a correction or removal.