Home / Türkiye / Steel plants / İÇDAŞ Biga steel plant

İÇDAŞ Biga steel plant

Steel Plant in Türkiye. Approximate location 40.44312, 27.13787.

Steel PlantTürkiyeCO₂ reported

İÇDAŞ Biga steel plant is a steel plant in Türkiye with a reported capacity of 5,001,000 t of steel. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace). It is operated by Içdaş Çelik Enerji Tersane Ve Ulaşim Sanayi AŞ. By capacity it ranks #2 of 26 steel plants tracked in Türkiye. It emits about 318,382 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 74,215 cars. Its CO₂ per unit of capacity is about 88% below the median steel plant.

5,001,000t of steel
318,382t CO₂e / yr (Climate TRACE)
#65CO₂ rank in Türkiye
0.06t CO₂ per capacity unit

Facility data: Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0), id ct-1567069.

En contexto: cómo se compara esta instalación

Con 5,001,000 t of steel, İÇDAŞ Biga steel plant está muy por encima de la mediana de steel plant en Türkiye (1,400,000 t of steel). Su CO₂ por unidad de capacidad es aproximadamente 32% por debajo de la mediana de steel plant. Subsector: iron-and-steel. Como steel plant, requiere calor de proceso intenso (típicamente 800–1500°C) para sus operaciones industriales centrales — calor que debe ser suministrado por calderas, hornos o combustión directa, y las pérdidas a través de recipientes y tuberías sin aislar representan combustible desperdiciado. El aislamiento modular desmontable puede reducir esas pérdidas en un 80–96%, enfriando superficies a ≤45°C, con amortización a menudo inferior a 2 años. Las plantas de acero queman carbón en altos hornos o utilizan arcos eléctricos para fundir chatarra; en ambos casos el metal fundido debe mantenerse por encima de 1.500°C y transferirse a través de tuberías y recipientes calientes extensos.

Comparación de capacidad e intensidad de CO₂ calculada a partir de datos de instalaciones industriales de Climate TRACE; papel del sector basado en referencia de ingeniería.

What 318,382 t CO₂e a year looks like

This facility's reported annual CO₂e in the everyday equivalents from the US EPA Greenhouse Gas Equivalencies calculator:

74,215cars driven for a year
41,521homes' annual energy use
5,306,367tree seedlings grown 10 years

Equivalencies: US EPA Greenhouse Gas Equivalencies. Emissions: Climate TRACE.

Capacity vs largest steel plants in Türkiye

Isdemir Payas steel plant: 5,800,000 t of steel5.8MIsdemir Pa…İÇDAŞ Biga steel plant: 5,001,000 t of steel5.0MİÇDAŞ Biga…Colakoglu Metallurgical Dilovasi plant: 4,500,000 t of steel4.5MColakoglu …Habas Aliaga steel plant: 4,500,000 t of steel4.5MHabas Alia…Toscelik Iskenderun steel plant: 4,000,000 t of steel4.0MToscelik I…Erdemir Eregli steel plant: 3,801,000 t of steel3.8MErdemir Er…Kardemir Merkez steel plant: 3,501,000 t of steel3.5MKardemir M…MMK Türkiye Metallurgical Payas plant: 2,500,000 t of steel2.5MMMK Türkiy…

Reported capacity (t of steel), Climate TRACE v6 (asset-level capacity & CO₂e, CC BY 4.0).

Operator

Operated by Içdaş Çelik Enerji Tersane Ve Ulaşim Sanayi AŞ. All facilities by this operator →

Local climate

İÇDAŞ Biga steel plant sits in a hot-summer Mediterranean climate zone (Köppen Csa), at 40.4°N in the northern hemisphere.

~17°Ctypical annual mean
~27°Ctypical warm-season
Hot-summer mediterranean: four distinct seasons — cold winters and warm summers

Köppen zone: Köppen-Geiger world climate classification (Kottek et al. 2006, 0.5° grid).

How it compares & nearby sites

The #2 largest of 26 steel plants in Türkiye by reported capacity.

Nearby industrial sites

Location

Coordinates 40.44312, 27.13787. View on OpenStreetMap.

Heat loss & insulation profile

A steel plant like this runs hot equipment that sheds heat continuously: reheat & annealing furnaces, ladles, hot-blast stoves, steam & gas ducting (surface/process temperatures around 200–1,200 °C). These surfaces lose energy to the air year-round; removable modular insulation cuts that loss, brings outer surfaces to ≤45 °C, and unclips for inspection.

Indicative recoverable energy

On an already-insulated site (pipes & valves in cladding / jackets), closing the remaining gaps, flanges and damaged sections and switching to removable covers indicatively recovers about 3,800 MWh/yr (≈ 1,300 t CO₂/yr) — scaled to this site's reported CO₂ within its sector. Bare or damaged surfaces recover several times more.

See Inzonex insulation → Estimate your site →

Indicative, not a measurement. Conservative floor for an already-insulated plant; a TIPCHECK on-site audit gives a measured figure. Industry context: EiiF TIPCHECK — industrial insulation can save ~14 Mtoe/yr in EU, payback typically <2 years.

Safety & the no-regret first step

Bare hot surfaces here exceed the touch-safe limit (EN ISO 13732-1); insulation to ≤45 °C is a worker-safety and compliance win. And before electrification, fuel-switching or CCS, eliminating surface heat loss is the cheapest, fastest, lowest-risk step — audit the bare spots first, rip-and-replace later.

External climate finance your country can access

Domestic energy-efficiency grants are limited here; industrial decarbonisation is mainly funded externally:

CBAM. Exporters of cement, steel, aluminium, fertiliser, hydrogen and electricity to the EU face the Carbon Border Adjustment Mechanism — cutting embedded emissions (efficiency + insulation) lowers the levy.

Routed via national development banks / accredited entities — not a direct factory grant. Verified 2026.

Frequently asked questions

What type of facility is İÇDAŞ Biga steel plant?

İÇDAŞ Biga steel plant is a steel plant in Türkiye. It produces crude steel from iron ore (blast furnace) or scrap (electric arc furnace).

What is the capacity of İÇDAŞ Biga steel plant?

İÇDAŞ Biga steel plant has a reported capacity of 5,001,000 t of steel.

How much CO₂ does İÇDAŞ Biga steel plant emit?

İÇDAŞ Biga steel plant emits about 318,382 tonnes of CO₂e per year (Climate TRACE) — roughly the tailpipe emissions of 74,215 cars. That ranks #65 among tracked facilities in Türkiye.

Where is İÇDAŞ Biga steel plant located?

İÇDAŞ Biga steel plant is in Türkiye, near coordinates 40.44312, 27.13787.

Who operates İÇDAŞ Biga steel plant?

İÇDAŞ Biga steel plant is operated by Içdaş Çelik Enerji Tersane Ve Ulaşim Sanayi AŞ.

Built from open public data; no personal information. Operate this site? Request a correction or removal.