Iron & steel in Bangladesh: emitters, CO2 & carbon value

5 tracked facilities, ≈7,270,878 t CO2/yr combined — here are the largest, what that CO2 is worth at current prices, and the sector's reduction pathway. Full sector pathway: decarbonizing iron & steel.

Os números

Iron & steel in Bangladesh at a glance

MétricaValorNota
Facilities tracked5with CO2 estimates
Total est. CO27,270,878 t/yrClimate TRACE 2023
Average per facility1,454,176 t/yr
Indicative carbon value€548M/yrat €75.36/t CBAM
📦 Iron & steel is a CBAM sector. EU-bound exports from Bangladesh pay the border price on the 2026→2034 phase-in — how CBAM works.

No carbon-pricing instrument is tracked for this country on this hub — exporters of CBAM goods to the EU still pay the border price with no domestic deduction.

Largest emitters

Top 5 iron & steel CO2 emitters in Bangladesh

#InstalaçãoOwnert CO2/ano (est. 2023)Valor indicativo
1BSRM Ltd Mirsarai plant4,449,154€335.3M
2BSRM Steels Mirsarai plant2,190,353€165.1M
3GPH Steel Sitakunda plantGPH Ispat Ltd333,972€25.2M
4Abul Khair Steel Sitakunda plantAbul Khair Steel Ltd254,428€19.2M
5KSRM Sitakunda steel plantKSRM Steel Plant Ltd42,971€3.2M

Climate TRACE satellite estimates via IndustryAtlas — modelled, not verified; some entries aggregate clusters. Corrections welcome.

Isolamento modular amovível Inzonex em equipamento industrial
Corte as toneladas na origem

Equipamento industrial quente? Corte a perda de calor.

As caldeiras, fornos, permutadores de calor, válvulas e linhas de vapor perdem energia continuamente. A Inzonex fabrica isolamento modular amovível patenteado (UK GB2508992.1) — coberturas com fecho de mola projetadas por nível de temperatura, não capas genéricas de prateleira:

  • Até 90% menos perda de calor de superfícies isoladas
  • Temperatura de superfície ≤45 °C — seguro ao toque para os trabalhadores (EN ISO 13732-1)
  • acesso de manutenção 6× mais rápido do que o revestimento fixo de cortar-e-soldar — desencaixa e volta a colocar-se em minutos, sem destruição
  • Inspecionável — sai para verificar a corrosão sob isolamento, depois volta a colocar-se como nova (as capas genéricas frequentemente não sobrevivem à remoção)
  • Retorno típico menos de 2 anos (alguns 9–11 meses)
Same industry, other countries
Other industries in Bangladesh
FAQ

Perguntas

How many iron & steel facilities does Bangladesh have with tracked emissions?
5 facilities carry satellite-based CO2 estimates in our dataset (Climate TRACE 2023), totalling ≈7,270,878 t CO2/yr.
What is the largest iron & steel emitter in Bangladesh?
BSRM Ltd Mirsarai plant — ≈4,449,154 t CO2/yr (est. 2023). Estimates are modelled, not verified declarations.
What would this CO2 cost at the CBAM price?
≈€548M per year at €75.36/t — indicative full-price value; actual cost depends on the EU-bound export share.
Como esta página é construída: os valores de perdas de calor seguem ASTM C680 / ISO 12241 (o método por trás do nosso calculadores públicos); emissões das instalações de Climate TRACE e dados verificados do EU ETS em 30 000+ sites industriais; o calendário 2026–2034 é Regulamento (UE) 2023/956, não uma previsão. Publicado pela Inzonex — fabricante de isolamento modular amovível (Patente do Reino Unido GB2508992.1). Encontrou um erro? Fale connosco — corrigimos com base em evidência.
Fonte: Inzonex Carbon Hub — inzonex.co.uk/carbon · preços datados como mostrado em cada figura · calendário conforme o Regulamento (UE) 2023/956 · análise indicativa, não aconselhamento de conformidade.