CSRD-rapportage draait op de European Sustainability Reporting Standards; E1 (Klimaatverandering) is degene die elke industriële rapporteur moet aanpakken. Het wil niet alleen uw emissies — het wil uw acties, het geld erachter, en de doelen die ze dienen (Gedelegeerde Verordening (EU) 2023/2772).
The scope was cut hard, and it is now final. The Omnibus I Directive (EU) 2026/47 was published in the Official Journal on 26 Feb 2026 and entered into force on 18 Mar 2026. Mandatory CSRD now applies only to EU companies with more than 1,000 employees AND over €450M net turnover — up from the old 250-employee / €50M test. The Commission estimates this removes ~80% of previously-in-scope companies. Wave-1 companies (first reports published 2025 on FY2024) keep reporting for FY2025 and FY2026, but those now below the new thresholds may take an optional transitional exemption, subject to each Member State's transposition. Practical read: many mid-size industrials are no longer directly in scope — but if you supply a company that still is, their ESRS E1 data requests reach you regardless of your own size.
| Gegevenspunt | Naam | Wat het werkelijk vraagt |
|---|---|---|
| E1-1 | Transitieplan voor klimaatmitigatie | Uw decarbonisatiehefbomen, becijferd en gedateerd |
| E1-3 | Acties en middelen | Concrete genomen/geplande maatregelen + CapEx/OpEx erachter |
| E1-4 | Doelen | BKG-reductiedoelen — en de maatregelen die ze geloofwaardig maken |
| E1-5 | Energieverbruik & -mix | Totale energie, intensiteit per netto-omzet |
| E1-6 | Bruto Scope 1, 2, 3 | De inventaris zelf |
Auditors (beperkte assurance nu, redelijke assurance gepland) toetsen of E1-3-acties echt, meetbaar en gekoppeld aan E1-4-doelen zijn.
Ketels, ovens, warmtewisselaars, afsluiters en stoomleidingen verliezen continu energie. Inzonex maakt Inzonex Modular Insulation — snap-fastened modules engineered per temperature tier, not generic off-the-shelf jackets:
Every tonne you stop emitting is a tonne you don't have to report: cutting heat loss is a measurable, auditable Scope 1 reduction that flows straight into EU ETS, CBAM and your ESG / CSRD disclosures — not an offset, an actual emission cut.
De structuur — maatregel, methode, energie, tonnen, geld, doelkoppeling, verificatie — is precies wat assuranceaanbieders vragen. Genereer de cijfers voor uw eigen project met de certificaattool.
De meeste E1-transitieplanhefbomen zijn kapitaalprogramma's met horizonten in de jaren 2030 (brandstofovergang, elektrificatie, CCS). Efficiëntiemaatregelen zijn de enige vermeldingen die tegelijk: geïmplementeerd zijn dit jaar (E1-3), measurable against meters (assurance-proof), cash-positive (the CFO signs), and visible in the E1-5 intensity line the following year. At €80.01/t they also cut the ETS-rekening — dezelfde ton werkt drie keer.