Inzonex Carbon Hub提供: inzonex.co.uk
Carbon Hub国 × 産業 → Vietnam · Iron & steel
Data layer · est. 2023

Iron & steel in Vietnam: emitters, CO2 & carbon value

20 tracked facilities, ≈29,802,538 t CO2/yr combined — here are the largest, what that CO2 is worth at current prices, and the sector's reduction pathway. Full sector pathway: decarbonizing iron & steel.

数値

Iron & steel in Vietnam at a glance

指標価値注記
Facilities tracked20with CO2 estimates
Total est. CO229,802,538 t/yrClimate TRACE 2023
Average per facility1,490,127 t/yr
Indicative carbon value€2,246M/yrat €75.36/t CBAM
📦 Iron & steel is a CBAM sector. EU-bound exports from Vietnam pay the border price on the 2026→2034 phase-in — how CBAM works.

No carbon-pricing instrument is tracked for this country on this hub — exporters of CBAM goods to the EU still pay the border price with no domestic deduction.

Largest emitters

Top 10 iron & steel CO2 emitters in Vietnam

#施設Ownert CO2/年(2023年推計)指標的な価値
1Formosa Ha Tinh Steel plantFormosa Ha Tinh Steel Corp9,222,302€695.0M
2Hoa Phat Dung Quat steel plantHoa Phat Dung Quat Steel JSC6,702,779€505.1M
3Hoa Phat Hai Duong Steel plantHoa Phat Hai Duong Steel JSC2,974,580€224.2M
4Vina One Steel Ben Luc steel plant2,927,945€220.6M
5VAS Nghi Son Cast Iron and Steel plantNghi Son VAS Group JSC2,816,235€212.2M
6ASEAN Steel Hoa Phu steel plant1,219,977€91.9M
7Viet Nhat VJS Nam Cau Kien steel plant1,219,977€91.9M
8Tuyen Quang Iron and Steel Long Binh steel plant867,170€65.3M
9Lao Cai Cast Iron and Steel PlantLao Cai Cast Iron and Steel789,052€59.5M
10Pomina Steel 3 Phu My plantPomina Steel JSC203,290€15.3M

Climate TRACE satellite estimates via IndustryAtlas — modelled, not verified; some entries aggregate clusters. Corrections welcome.

産業設備へのInzonex取り外し可能モジュール式断熱
発生源でトンを削減する

高温の産業設備? 熱損失を削減しましょう。

ボイラー、キルン、熱交換器、バルブ、蒸気ラインは継続的にエネルギーを失います。Inzonexは次を作ります: 特許取得済み(UK GB2508992.1)の取り外し可能モジュール式断熱 — 温度区分ごとに設計されたスナップ留めのカバー、汎用の既製の被覆ではなく:

  • 熱損失を最大90%削減 断熱された表面から
  • 表面温度 ≤45 °C — 作業者にとって接触安全(EN ISO 13732-1)
  • 6倍速いメンテナンスアクセス 固定式の切断・溶接の被覆よりも — 数分で外して再装着、破壊なし
  • 検査可能 — 断熱下腐食(CUI)の点検のために外れ、その後新品同様に再装着します(汎用の被覆はしばしば取り外しに耐えません)
  • 典型的な投資回収 2年未満 (一部9〜11か月)
Same industry, other countries
Other industries in Vietnam
FAQ

質問

How many iron & steel facilities does Vietnam have with tracked emissions?
20 facilities carry satellite-based CO2 estimates in our dataset (Climate TRACE 2023), totalling ≈29,802,538 t CO2/yr.
What is the largest iron & steel emitter in Vietnam?
Formosa Ha Tinh Steel plant — ≈9,222,302 t CO2/yr (est. 2023). Estimates are modelled, not verified declarations.
What would this CO2 cost at the CBAM price?
≈€2,246M per year at €75.36/t — indicative full-price value; actual cost depends on the EU-bound export share.
このページがどう作られているか: 熱損失の数値は次に従う ASTM C680 / ISO 12241 (私たちの…の背後の方法 公開計算機); 施設排出は次から: Climate TRACE および30,000超の産業サイトにわたるEU ETS検証済みデータ; 2026〜2034年のスケジュールは Regulation (EU) 2023/956、予測ではありません。Inzonexが発行 — モジュール式取り外し可能断熱の製造者(UK Patent GB2508992.1)。誤りを見つけましたか? 私たちに伝える — 私たちは証拠に基づいて訂正します。
出典: Inzonex Carbon Hub — inzonex.co.uk/carbon · 価格は各図に表示されたとおりに日付付き · スケジュールはRegulation (EU) 2023/956に準拠 · 指標的な分析であり、コンプライアンス助言ではありません。