10 tracked facilities, ≈24,177,019 t CO2/yr combined — here are the largest, what that CO2 is worth at current prices, and the sector's reduction pathway. Full sector pathway: decarbonizing iron & steel.
| 指標 | 価値 | 注記 |
|---|---|---|
| Facilities tracked | 10 | with CO2 estimates |
| Total est. CO2 | 24,177,019 t/yr | Climate TRACE 2023 |
| Average per facility | 2,417,702 t/yr | |
| Indicative carbon value | €1,822M/yr | at €75.36/t CBAM |
No carbon-pricing instrument is tracked for this country on this hub — exporters of CBAM goods to the EU still pay the border price with no domestic deduction.
| # | 施設 | Owner | t CO2/年(2023年推計) | 指標的な価値 |
|---|---|---|---|---|
| 1 | China Steel Corporation Xiaogang plant | China Steel Corp | 14,878,289 | €1,121.2M |
| 2 | China Steel Dragon Steel Taichung plant | Dragon Steel Corp | 8,048,952 | €606.6M |
| 3 | Tung Ho Steel Miaoli Plant | Tung Ho Steel Enterprise Corp | 249,415 | €18.8M |
| 4 | Tung Ho Steel Taoyuan Plant | Tung Ho Steel Enterprise Corp | 207,846 | €15.7M |
| 5 | Yieh United Steel Kaohsiung plant | Yieh United Steel Corp | 183,975 | €13.9M |
| 6 | Shyeh Sheng Fuat Steel Kaohsiung plant | Shyeh Sheng Fuat Steel & Iron Works Co Ltd | 166,691 | €12.6M |
| 7 | Tung Ho Steel Kaohsiung Plant | Tung Ho Steel Enterprise Corp | 145,492 | €11.0M |
| 8 | Hai Kwang Enterprise Corporation | Hai Kwang Enterprise Corp | 138,909 | €10.5M |
| 9 | Feng Hsin Steel Taichung plant | Feng Hsin Steel Co Ltd | 116,394 | €8.8M |
| 10 | E Top Metal Changhua plant | E-Top Metal Co Ltd | 41,056 | €3.1M |
Climate TRACE satellite estimates via IndustryAtlas — modelled, not verified; some entries aggregate clusters. Corrections welcome.
ボイラー、キルン、熱交換器、バルブ、蒸気ラインは継続的にエネルギーを失います。Inzonexは次を作ります: 特許取得済み(UK GB2508992.1)の取り外し可能モジュール式断熱 — 温度区分ごとに設計されたスナップ留めのカバー、汎用の既製の被覆ではなく: