Inzonex BreweryAtlas

Diageo Usvi

Major brewery in Saint Croix Island, Virgin Islands, U.S..

Diageo Usvi is Major located in Saint Croix Island, Virgin Islands, U.S.. It is one of 1 industrial & regional breweries mapped in Virgin Islands, U.S. on BreweryAtlas (pub microbreweries excluded). Public source fields used on this profile: climatetrace-brand. Saint Croix is one of Virgin Islands, U.S.'s key brewing regions, with a long tradition of large-scale beer production and a strong industrial base.

CountryVirgin Islands, U.S.
Region / stateSaint Croix Island
Size classMajor
Owner / group
CO₂ emissions (2024)37,789 t/yr (modelled estimate · Climate TRACE 2024)
Year
Sourcesclimatetrace-brand

📍 17.715, -64.776 — locate it on the interactive map.

Calculate from site inputs

A credible saving requires actual equipment geometry, temperatures, operating hours, insulation thickness and energy price. BreweryAtlas does not invent these values.

Open the brewery heat-loss calculator →

Location & climate

Diageo Usvi is located near Saint Croix, Virgin Islands, U.S., in a Aw climate zone (Köppen Aw) with typical temperatures around 26–29 °C. Warm ambient conditions can increase refrigeration demand. Actual process equipment and heat loss must be confirmed for the individual site.

Köppen-Geiger zone (offline grid). Coordinates: 17.715, -64.776.

CO₂ (2024)

Climate TRACE modelled facility estimate: 37,789 t/yr (2024).

Figure: Climate TRACE modelled annual facility estimate for Diageo Usvi (2024).

About Diageo Usvi

How much CO₂ does Diageo Usvi emit?

Climate TRACE's modelled 2024 facility estimate for Diageo Usvi is 37,789 tonnes per year. It is the median of displayed estimates in Virgin Islands, U.S.; it is not a direct site measurement.

Breweries near Saint Croix

Breweries may have hot vessels and pipework suitable for removable insulation. Enter the actual equipment and operating conditions in the Inzonex brewery calculator →

This profile reports source-backed public fields only. Climate TRACE figures are modelled facility estimates, not site measurements. Equipment and savings require site inputs. See methodology.