6 tracked facilities, ≈1,389,902 t CO2/yr combined — here are the largest, what that CO2 is worth at current prices, and the sector's reduction pathway. Full sector pathway: decarbonizing cement.
| Métrica | Valor | Nota |
|---|---|---|
| Facilities tracked | 6 | with CO2 estimates |
| Total est. CO2 | 1,389,902 t/yr | Climate TRACE 2023 |
| Average per facility | 231,650 t/yr | |
| Indicative carbon value | €105M/yr | at €75.36/t CBAM |
Carbon pricing here: CO2 levy CHF 120/t on heating fuels; Swiss ETS linked to the EU ETS. Current benchmark: no liquid market price. Full country page: carbon price in Switzerland.
| # | Instalação | Owner | t CO2/ano (est. 2023) | Valor indicativo |
|---|---|---|---|---|
| 1 | Untervaz Cement Plant | Holcim (Schweiz) AG | 356,766 | €26.9M |
| 2 | Eclepens Cement Plant | Holcim (Schweiz) AG | 287,105 | €21.6M |
| 3 | Moriken Wildegg Cement Plant | Jura-Holding AG | 240,195 | €18.1M |
| 4 | Pery La Heutte Cement Plant | Holcim (Schweiz) AG | 215,365 | €16.2M |
| 5 | Wurenlingen Cement Plant | Holcim (Schweiz) AG | 197,632 | €14.9M |
| 6 | Cornaux Cement Plant | Juracime SA | 92,839 | €7.0M |
Climate TRACE satellite estimates via IndustryAtlas — modelled, not verified; some entries aggregate clusters. Corrections welcome.
As caldeiras, fornos, permutadores de calor, válvulas e linhas de vapor perdem energia continuamente. A Inzonex fabrica isolamento modular amovível patenteado (UK GB2508992.1) — coberturas com fecho de mola projetadas por nível de temperatura, não capas genéricas de prateleira: