10 tracked facilities, ≈5,093,981 t CO2/yr combined — here are the largest, what that CO2 is worth at current prices, and the sector's reduction pathway. Full sector pathway: decarbonizing petrochemicals (steam cracking).
| Métrica | Valor | Nota |
|---|---|---|
| Facilities tracked | 10 | with CO2 estimates |
| Total est. CO2 | 5,093,981 t/yr | Climate TRACE 2023 |
| Average per facility | 509,398 t/yr | |
| Indicative carbon value | €394M/yr | at €77.4/t EUA |
No carbon-pricing instrument is tracked for this country on this hub — exporters of CBAM goods to the EU still pay the border price with no domestic deduction.
| # | Instalação | Owner | t CO2/ano (est. 2023) | Valor indicativo |
|---|---|---|---|---|
| 1 | Zapsibneftekhim, Tobolsk | SIBUR Holding PJSC | 1,541,590 | €119.3M |
| 2 | Kazanorgsintez, Kazan | SIBUR Holding PJSC | 712,521 | €55.1M |
| 3 | Nizhnekamskneftekhim, Nizhnekamsk | SIBUR Holding PJSC | 681,735 | €52.8M |
| 4 | Sibur Kstovo, Nizhny Novgorod | SIBUR Holding PJSC | 470,886 | €36.4M |
| 5 | Lukoil Stavrolen, Budennovsk | — | 467,592 | €36.2M |
| 6 | Gazprom neftekhim salavat, Salavat | Gazprom PJSC | 402,543 | €31.2M |
| 7 | Tomsknefteheim, Tomsk | SIBUR Holding PJSC | 336,347 | €26.0M |
| 8 | Angarsk polymer plant, Angarsk, Siberia | Rosneft PJSC | 224,231 | €17.4M |
| 9 | Novokuibyshevsk Petrochemical Company, Samara | Rosneft PJSC | 207,394 | €16.1M |
| 10 | Sibur Khimprom, Perm | SIBUR Holding PJSC | 49,142 | €3.8M |
Climate TRACE satellite estimates via IndustryAtlas — modelled, not verified; some entries aggregate clusters. Corrections welcome.
As caldeiras, fornos, permutadores de calor, válvulas e linhas de vapor perdem energia continuamente. A Inzonex fabrica isolamento modular amovível patenteado (UK GB2508992.1) — coberturas com fecho de mola projetadas por nível de temperatura, não capas genéricas de prateleira: