Inzonex Carbon Hubdesenvolvido por inzonex.co.uk
Carbon HubPaís × indústria → Nigeria · Oil & gas production
Data layer · est. 2023

Oil & gas production in Nigeria: emitters, CO2 & carbon value

5 tracked facilities, ≈89,966,739 t CO2/yr combined — here are the largest, what that CO2 is worth at current prices, and the sector's reduction pathway. Full sector pathway: decarbonizing oil & gas production.

Os números

Oil & gas production in Nigeria at a glance

MétricaValorNota
Facilities tracked5with CO2 estimates
Total est. CO289,966,739 t/yrClimate TRACE 2023
Average per facility17,993,348 t/yr
Indicative carbon value€6,963M/yrat €77.4/t EUA

No carbon-pricing instrument is tracked for this country on this hub — exporters of CBAM goods to the EU still pay the border price with no domestic deduction.

Largest emitters

Top 5 oil & gas production CO2 emitters in Nigeria

#InstalaçãoOwnert CO2/ano (est. 2023)Valor indicativo
1Nigeria_Niger Delta_Conventional onshoreDubri Oil44,661,308€3,456.8M
2Nigeria_Niger Delta_Conventional shelfNNPC Ltd26,342,645€2,038.9M
3Nigeria_Niger Delta_DeepwaterExxon Mobil Corp13,767,835€1,065.6M
4Nigeria_Niger Delta_Heavy oil3,652,362€282.7M
5Nigeria_Niger Delta_LNG1,542,589€119.4M

Climate TRACE satellite estimates via IndustryAtlas — modelled, not verified; some entries aggregate clusters. Corrections welcome.

Isolamento modular amovível Inzonex em equipamento industrial
Corte as toneladas na origem

Equipamento industrial quente? Corte a perda de calor.

As caldeiras, fornos, permutadores de calor, válvulas e linhas de vapor perdem energia continuamente. A Inzonex fabrica isolamento modular amovível patenteado (UK GB2508992.1) — coberturas com fecho de mola projetadas por nível de temperatura, não capas genéricas de prateleira:

  • Até 90% menos perda de calor de superfícies isoladas
  • Temperatura de superfície ≤45 °C — seguro ao toque para os trabalhadores (EN ISO 13732-1)
  • acesso de manutenção 6× mais rápido do que o revestimento fixo de cortar-e-soldar — desencaixa e volta a colocar-se em minutos, sem destruição
  • Inspecionável — sai para verificar a corrosão sob isolamento, depois volta a colocar-se como nova (as capas genéricas frequentemente não sobrevivem à remoção)
  • Retorno típico menos de 2 anos (alguns 9–11 meses)
Same industry, other countries
Other industries in Nigeria
FAQ

Perguntas

How many oil & gas production facilities does Nigeria have with tracked emissions?
5 facilities carry satellite-based CO2 estimates in our dataset (Climate TRACE 2023), totalling ≈89,966,739 t CO2/yr.
What is the largest oil & gas production emitter in Nigeria?
Nigeria_Niger Delta_Conventional onshore — ≈44,661,308 t CO2/yr (est. 2023). Estimates are modelled, not verified declarations.
What would this CO2 cost at the EU price?
≈€6,963M per year at €77.4/t — indicative full-price value; actual cost depends on free allocation and the local instrument.
Como esta página é construída: os valores de perdas de calor seguem ASTM C680 / ISO 12241 (o método por trás do nosso calculadores públicos); emissões das instalações de Climate TRACE e dados verificados do EU ETS em 30 000+ sites industriais; o calendário 2026–2034 é Regulamento (UE) 2023/956, não uma previsão. Publicado pela Inzonex — fabricante de isolamento modular amovível (Patente do Reino Unido GB2508992.1). Encontrou um erro? Fale connosco — corrigimos com base em evidência.
Fonte: Inzonex Carbon Hub — inzonex.co.uk/carbon · preços datados como mostrado em cada figura · calendário conforme o Regulamento (UE) 2023/956 · análise indicativa, não aconselhamento de conformidade.