Inzonex Carbon Hubmogelijk gemaakt door inzonex.co.uk
Carbon HubLand × sector → Pakistan · Iron & steel
Data layer · est. 2023

Iron & steel in Pakistan: emitters, CO2 & carbon value

5 tracked facilities, ≈3,953,334 t CO2/yr combined — here are the largest, what that CO2 is worth at current prices, and the sector's reduction pathway. Full sector pathway: decarbonizing iron & steel.

De cijfers

Iron & steel in Pakistan at a glance

MetriekWaardeOpmerking
Facilities tracked5with CO2 estimates
Total est. CO23,953,334 t/yrClimate TRACE 2023
Average per facility790,667 t/yr
Indicative carbon value€298M/yrat €75.36/t CBAM
📦 Iron & steel is a CBAM sector. EU-bound exports from Pakistan pay the border price on the 2026→2034 phase-in — how CBAM works.

No carbon-pricing instrument is tracked for this country on this hub — exporters of CBAM goods to the EU still pay the border price with no domestic deduction.

Largest emitters

Top 5 iron & steel CO2 emitters in Pakistan

#InstallatieOwnert CO2/jaar (geschat 2023)Indicatieve waarde
1Amreli Steels Dhabeji plant1,199,271€90.4M
2Mughal Iron & Steel Industries Lahore plant1,165,291€87.8M
3Ittehad Steel Faisalabad plantIttehad Steels Pvt Ltd799,514€60.3M
4Faizan Steel Karachi steel plant729,556€55.0M
5Agha Steel Industries Karachi plantAgha Steel Industries Ltd59,702€4.5M

Climate TRACE satellite estimates via IndustryAtlas — modelled, not verified; some entries aggregate clusters. Corrections welcome.

Inzonex afneembare modulaire isolatie op industriële apparatuur
Snij de tonnen weg bij de bron

Hete industriële uitrusting? Beperk het warmteverlies.

Ketels, ovens, warmtewisselaars, afsluiters en stoomleidingen verliezen continu energie. Inzonex maakt gepatenteerde (UK GB2508992.1) afneembare modulaire isolatie — hoezen met drukknopen ontworpen per temperatuurklasse, geen generieke kant-en-klare jassen:

  • Tot 90% minder warmteverlies van geïsoleerde oppervlakken
  • Oppervlaktetemperatuur ≤45 °C — aanraakveilig voor werknemers (EN ISO 13732-1)
  • 6× snellere onderhoudstoegang dan vaste snij-en-las-isolatie — klikt los en weer vast in minuten, geen vernieling
  • Inspecteerbaar — gaat eraf om corrosie onder de isolatie te controleren, en gaat dan als nieuw weer op (generieke jassen overleven de verwijdering vaak niet)
  • Typische terugverdientijd minder dan 2 jaar (soms 9–11 maanden)
Same industry, other countries
Other industries in Pakistan
FAQ

Vragen

How many iron & steel facilities does Pakistan have with tracked emissions?
5 facilities carry satellite-based CO2 estimates in our dataset (Climate TRACE 2023), totalling ≈3,953,334 t CO2/yr.
What is the largest iron & steel emitter in Pakistan?
Amreli Steels Dhabeji plant — ≈1,199,271 t CO2/yr (est. 2023). Estimates are modelled, not verified declarations.
What would this CO2 cost at the CBAM price?
≈€298M per year at €75.36/t — indicative full-price value; actual cost depends on the EU-bound export share.
Hoe deze pagina is opgebouwd: warmteverliescijfers volgen ASTM C680 / ISO 12241 (de methode achter onze openbare calculators); installatie-emissies uit Climate TRACE & geverifieerde EU ETS-gegevens over 30.000+ industriële sites; het schema 2026–2034 is Verordening (EU) 2023/956, geen voorspelling. Gepubliceerd door Inzonex — fabrikant van modulaire afneembare isolatie (UK Patent GB2508992.1). Een fout gezien? Vertel het ons — wij corrigeren op basis van bewijs.
Bron: Inzonex Carbon Hub — inzonex.co.uk/carbon · prijzen gedateerd zoals getoond bij elk cijfer · schema volgens Verordening (EU) 2023/956 · indicatieve analyse, geen nalevingsadvies.