html
UK-ETS ≈55 £ (Mitte 2025, ICE). EU-Verknüpfungsgespräche 2025 angekündigt; UK CBAM ab 2027 geplant.
Carbon Price Support fügt für Stromerzeuger 18 £/t zusätzlich zum UK-ETS hinzu.
At the EU ETS price of €80.01/t, this CO2 corresponds to an indicative carbon value of:
| Anlage | Sektor | t CO2/Jahr (geschätzt 2023) | Gross value (full) |
|---|---|---|---|
| Tata Steel Port Talbot steel plant | 2,871,723 | €216.4M | |
| British Steel Scunthorpe plant | 2,460,320 | €185.4M | |
| INEOS , Grangemouth | 1,253,878 | €94.5M | |
| Hope Cement Plant | 717,958 | €54.1M | |
| ExxonMobil Chemical Co. , Mossmorran Fife | 696,425 | €52.5M |
Gross value = all tracked CO2 × the carbon price; it is a ranking aid, not a liability. Emissions: Climate TRACE satellite estimates (2023) — indicative, not verified declarations. CBAM falls only on emissions embedded in EU-bound exports, at the phased-in share (2.5% in 2026 → 100% by 2034). More: IndustryAtlas.
Senken Sie die Rechnung an der Quelle: Wärmeverlustbeseitigung durch abnehmbare Dämmung spart typischerweise 2–5% des brennstoffbedingten CO2 bei <2 Jahren Amortisation — führen Sie die Einsparungsstudie durch oder lesen Sie den Leitfaden zur industriellen Dämmung.