Die drittgrößte Volkswirtschaft der Welt bepreist CO2 über das GX-Transformationsrahmenwerk.
GX-ETS Freiwilligenphase; verpflichtend ab GJ2026, CO2-Abgabe ab 2028. Tokios Cap-and-Trade existiert lokal.
At the EU ETS price of €80.01/t, this CO2 corresponds to an indicative carbon value of:
| Anlage | Sektor | t CO2/Jahr (geschätzt 2023) | Gross value (full) |
|---|---|---|---|
| JFE West Japan Works (Fukuyama) steel plant | 19,085,123 | €1,438.3M | |
| JFE West Japan Works (Kurashiki) steel plant | 13,044,457 | €983.0M | |
| Nippon East Japan Works (Kimitsu) steel plant | 12,921,079 | €973.7M | |
| Nippon Kyushu Works (Oita Area, Oita) steel plant | 11,600,217 | €874.2M | |
| Nippon East Japan Works (Kashima) steel plant | 9,268,493 | €698.5M |
Gross value = all tracked CO2 × the carbon price; it is a ranking aid, not a liability. Emissions: Climate TRACE satellite estimates (2023) — indicative, not verified declarations. CBAM falls only on emissions embedded in EU-bound exports, at the phased-in share (2.5% in 2026 → 100% by 2034). More: IndustryAtlas.
Senken Sie die Rechnung an der Quelle: Wärmeverlustbeseitigung durch abnehmbare Dämmung spart typischerweise 2–5% des brennstoffbedingten CO2 bei <2 Jahren Amortisation — führen Sie die Einsparungsstudie durch oder lesen Sie den Leitfaden zur industriellen Dämmung.