Inzonex Carbon Hubbereitgestellt von inzonex.co.uk
Carbon HubLand × Branche → United Arab Emirates · Oil refining
Data layer · est. 2023

Oil refining in United Arab Emirates: emitters, CO2 & carbon value

5 tracked facilities, ≈10,292,668 t CO2/yr combined — here are the largest, what that CO2 is worth at current prices, and the sector's reduction pathway. Full sector pathway: decarbonizing oil refining.

Die Zahlen

Oil refining in United Arab Emirates at a glance

KennzahlWertHinweis
Facilities tracked5with CO2 estimates
Total est. CO210,292,668 t/yrClimate TRACE 2023
Average per facility2,058,534 t/yr
Indicative carbon value€797M/yrat €77.4/t EUA

Carbon pricing here: No carbon price. Net-zero 2050 strategy; no ETS yet. Current benchmark: no liquid market price. Full country page: carbon price in United Arab Emirates.

Largest emitters

Top 5 oil refining CO2 emitters in United Arab Emirates

#AnlageOwnert CO2/Jahr (geschätzt 2023)Indikativer Wert
1Abu Dhabi Oil Refining Company Al-Ruwais RefineryOMV AG7,843,838€607.1M
2ENOC Jebel Ali RefineryEmirates National Oil Company LLC1,233,224€95.5M
3VTTI Fujairah RefineryVitol 469,799€36.4M
4Uniper Fujairah Refinery381,712€29.5M
5Ecomar Fujairah Refinery364,095€28.2M

Climate TRACE satellite estimates via IndustryAtlas — modelled, not verified; some entries aggregate clusters. Corrections welcome.

Abnehmbare modulare Inzonex-Dämmung an Industrieanlagen
Senken Sie die Tonnen an der Quelle

Heiße Industrieanlagen? Senken Sie den Wärmeverlust.

Kessel, Öfen, Wärmetauscher, Ventile und Dampfleitungen verlieren kontinuierlich Energie. Inzonex fertigt patentierte (UK GB2508992.1) abnehmbare modulare Dämmung — mit Druckknöpfen befestigte Hauben, je Temperaturstufe ausgelegt, keine generischen Standardummantelungen:

  • Bis zu 90% weniger Wärmeverlust von gedämmten Oberflächen
  • Oberflächentemperatur ≤45 °C — berührungssicher für Arbeiter (EN ISO 13732-1)
  • 6× schnellerer Wartungszugang als feste Schneid-und-Schweiß-Ummantelung — wird in Minuten aus- und wieder eingeklinkt, keine Zerstörung
  • Prüfbar — wird abgenommen, um Korrosion unter der Dämmung zu prüfen, dann wie neu wieder angebracht (generische Hauben überstehen das Abnehmen oft nicht)
  • Typische Amortisation unter 2 Jahren (teils 9–11 Monate)
Same industry, other countries
Other industries in United Arab Emirates
FAQ

Fragen

How many oil refining facilities does United Arab Emirates have with tracked emissions?
5 facilities carry satellite-based CO2 estimates in our dataset (Climate TRACE 2023), totalling ≈10,292,668 t CO2/yr.
What is the largest oil refining emitter in United Arab Emirates?
Abu Dhabi Oil Refining Company Al-Ruwais Refinery — ≈7,843,838 t CO2/yr (est. 2023). Estimates are modelled, not verified declarations.
What would this CO2 cost at the EU price?
≈€797M per year at €77.4/t — indicative full-price value; actual cost depends on free allocation and the local instrument.
Wie diese Seite aufgebaut ist: Wärmeverlustzahlen folgen ASTM C680 / ISO 12241 (die Methode hinter unserem öffentliche Rechner); Anlagenemissionen aus Climate TRACE & verifizierte EU-ETS-Daten über mehr als 30.000 Industriestandorte; der Zeitplan 2026–2034 ist Verordnung (EU) 2023/956, keine Prognose. Veröffentlicht von Inzonex — Hersteller modularer abnehmbarer Dämmung (UK Patent GB2508992.1). Einen Fehler entdeckt? Sagen Sie es uns — wir korrigieren auf Basis von Belegen.
Quelle: Inzonex Carbon Hub — inzonex.co.uk/carbon · Preise datiert wie an jeder Zahl angezeigt · Zeitplan gemäß Verordnung (EU) 2023/956 · indikative Analytik, keine Compliance-Beratung.