6 tracked facilities, ≈7,864,846 t CO2/yr combined — here are the largest, what that CO2 is worth at current prices, and the sector's reduction pathway. Full sector pathway: decarbonizing iron & steel.
| Kennzahl | Wert | Hinweis |
|---|---|---|
| Facilities tracked | 6 | with CO2 estimates |
| Total est. CO2 | 7,864,846 t/yr | Climate TRACE 2023 |
| Average per facility | 1,310,808 t/yr | |
| Indicative carbon value | €593M/yr | at €75.36/t CBAM |
Carbon pricing here: No national carbon tax (legacy excise ≈€0.1/t is negligible) — EU ETS dominates. Current benchmark: €77.4/t (11 Jun 2026). Full country page: carbon price in Poland.
| # | Anlage | Owner | t CO2/Jahr (geschätzt 2023) | Indikativer Wert |
|---|---|---|---|---|
| 1 | ArcelorMittal Dąbrowa Górnicza steel plant | ArcelorMittal Poland SA | 7,515,326 | €566.4M |
| 2 | CMC Zawiercie steel plant | CMC Poland SP zoo | 165,261 | €12.5M |
| 3 | ArcelorMittal Warszawa steel plant | Arcelormittal Warszawa SP zoo | 63,619 | €4.8M |
| 4 | Celsa Huta Ostrowiec steel plant | Celsa Huta Ostrowiec SP zoo | 48,471 | €3.7M |
| 5 | Huta Czestochowa steel plant | Liberty Steel Group | 45,240 | €3.4M |
| 6 | Ferrostal Labedy Gliwice steel plant | Ferrostal Labedy SP zoo | 26,929 | €2.0M |
Climate TRACE satellite estimates via IndustryAtlas — modelled, not verified; some entries aggregate clusters. Corrections welcome.
Kessel, Öfen, Wärmetauscher, Ventile und Dampfleitungen verlieren kontinuierlich Energie. Inzonex fertigt patentierte (UK GB2508992.1) abnehmbare modulare Dämmung — mit Druckknöpfen befestigte Hauben, je Temperaturstufe ausgelegt, keine generischen Standardummantelungen: