Inzonex Carbon Hubbereitgestellt von inzonex.co.uk
Carbon HubLand × Branche → Czechia · Cement
Data layer · est. 2023

Cement in Czechia: emitters, CO2 & carbon value

5 tracked facilities, ≈2,215,230 t CO2/yr combined — here are the largest, what that CO2 is worth at current prices, and the sector's reduction pathway. Full sector pathway: decarbonizing cement.

Die Zahlen

Cement in Czechia at a glance

KennzahlWertHinweis
Facilities tracked5with CO2 estimates
Total est. CO22,215,230 t/yrClimate TRACE 2023
Average per facility443,046 t/yr
Indicative carbon value€167M/yrat €75.36/t CBAM

Carbon pricing here: No national carbon tax — EU ETS only. Current benchmark: €77.4/t (11 Jun 2026). Full country page: carbon price in Czechia.

Largest emitters

Top 5 cement CO2 emitters in Czechia

#AnlageOwnert CO2/Jahr (geschätzt 2023)Indikativer Wert
1Mokra Cement PlantHeidelberg Materials CZ AS559,809€42.2M
2Prachovice Cement PlantCEMEX Czech Republic sro460,660€34.7M
3Radotin Cement PlantHeidelberg Materials CZ AS410,815€31.0M
4Hranice Cement PlantCement Hranice AS394,807€29.8M
5Cizkovice Cement PlantHolcim (Česko) AS389,139€29.3M

Climate TRACE satellite estimates via IndustryAtlas — modelled, not verified; some entries aggregate clusters. Corrections welcome.

Abnehmbare modulare Inzonex-Dämmung an Industrieanlagen
Senken Sie die Tonnen an der Quelle

Heiße Industrieanlagen? Senken Sie den Wärmeverlust.

Kessel, Öfen, Wärmetauscher, Ventile und Dampfleitungen verlieren kontinuierlich Energie. Inzonex fertigt patentierte (UK GB2508992.1) abnehmbare modulare Dämmung — mit Druckknöpfen befestigte Hauben, je Temperaturstufe ausgelegt, keine generischen Standardummantelungen:

  • Bis zu 90% weniger Wärmeverlust von gedämmten Oberflächen
  • Oberflächentemperatur ≤45 °C — berührungssicher für Arbeiter (EN ISO 13732-1)
  • 6× schnellerer Wartungszugang als feste Schneid-und-Schweiß-Ummantelung — wird in Minuten aus- und wieder eingeklinkt, keine Zerstörung
  • Prüfbar — wird abgenommen, um Korrosion unter der Dämmung zu prüfen, dann wie neu wieder angebracht (generische Hauben überstehen das Abnehmen oft nicht)
  • Typische Amortisation unter 2 Jahren (teils 9–11 Monate)
Same industry, other countries
Other industries in Czechia
FAQ

Fragen

How many cement facilities does Czechia have with tracked emissions?
5 facilities carry satellite-based CO2 estimates in our dataset (Climate TRACE 2023), totalling ≈2,215,230 t CO2/yr.
What is the largest cement emitter in Czechia?
Mokra Cement Plant — ≈559,809 t CO2/yr (est. 2023). Estimates are modelled, not verified declarations.
What would this CO2 cost at the CBAM price?
≈€167M per year at €75.36/t — indicative full-price value; actual cost depends on the EU-bound export share.
Wie diese Seite aufgebaut ist: Wärmeverlustzahlen folgen ASTM C680 / ISO 12241 (die Methode hinter unserem öffentliche Rechner); Anlagenemissionen aus Climate TRACE & verifizierte EU-ETS-Daten über mehr als 30.000 Industriestandorte; der Zeitplan 2026–2034 ist Verordnung (EU) 2023/956, keine Prognose. Veröffentlicht von Inzonex — Hersteller modularer abnehmbarer Dämmung (UK Patent GB2508992.1). Einen Fehler entdeckt? Sagen Sie es uns — wir korrigieren auf Basis von Belegen.
Quelle: Inzonex Carbon Hub — inzonex.co.uk/carbon · Preise datiert wie an jeder Zahl angezeigt · Zeitplan gemäß Verordnung (EU) 2023/956 · indikative Analytik, keine Compliance-Beratung.